METHOD OF TREATMENT OF WELL BOTTOMHOLE ZONE WITH LOW BED PRESSURE Russian patent published in 2008 - IPC E21B43/25 

Abstract RU 2330954 C1

FIELD: oil and gas industry.

SUBSTANCE: invention refers to mining and can be used for development and rejuvenation of producing wells yield, reduced as a result of mudding of a bottomhole zone with asphalt-tar-paraffin formations and mechanical additives. The method of treatment of a bottomhole of a well with a low bed pressure includes formation of a depressive pressure drop between the bottomhole zone and a reservoir of the well. Fluid is pumped into the well reservoir up to a process acceptable pressure. A shock wave, traveling in the well reservoir, creates recurrent pressure impulses in the bottomhole zone; the said wave occurs with alternate opening of the well reservoir at the mouth of the well for well fluid under pressure flowing out, and with its closing by means of valves. One of these - the fluid discharge valve - connects the well reservoir with a discharge reservoir; the second - the fluid refill valve - connects the well reservoir with the fluid source under pressure. The discharge reservoir is connected with a pump compressor pipe through the fluid discharge valve. The fluid source under pressure is connected with the annular space via the fluid refill valve. Pumping of fluid into the well up to a process acceptable level is performed through the annular space within time intervals between operations for creating the shock wave transfer in the well reservoir. The technical result is avoiding of mudding sediments penetration into the bed at rising of well pressure, required for creating the shock wave traveling in the well reservoir.

EFFECT: efficient method of treatment of a well bottomhole zone with low bed pressure by means of avoiding of mudding sediments penetration into the bed at rise of well pressure.

Similar patents RU2330954C1

Title Year Author Number
METHOD FOR FORMATION WELL BORE ZONE TREATMENT 2012
  • Shipulin Aleksandr Vladimirovich
RU2511220C2
METHOD OF TREATMENT OF BOTTOMHOLE ZONE OF WELL, EQUIPPED WITH PACKER 2007
  • Shipulin Aleksandr Vladimirovich
RU2330952C1
METHOD OF TREATMENT OF BOTTOMHOLE ZONE OF BED 2007
  • Shipulin Aleksandr Vladimirovich
RU2330953C1
METHOD OF TREATMENT OF WELL BOTTOMHOLE ZONE 2007
  • Shipulin Aleksandr Vladimirovich
RU2349747C1
TREATMENT METHOD FOR BOTTOMHOLE ZONE OF WELL EQUIPPED WITH BOTTOM-HOLE OIL PUMP 2012
  • Kupavykh Kirill Sergeevich
  • Shipulin Aleksandr Vladimirovich
RU2511167C1
PROCESSING METHOD OF BOTTOMHOLE ZONE 2006
  • Shipulin Aleksandr Vladimirovich
RU2327027C2
METHOD FOR FORMATION WELL BORE ZONE TREATMENT 2010
  • Shipulin Aleksandr Vladimirovich
RU2444620C1
METHOD OF WELL BOTTOM ZONE DEVELOPMENT 2007
  • Shipulin Aleksandr Vladimirovich
RU2344281C1
PROCEDURE OF WELL BOTTOMHOLE ZONE TREATMENT 2008
  • Shipulin Aleksandr Vladimirovich
RU2383720C1
TREATMENT METHOD OF BOTTOMHOLE ZONE 2012
  • Kupavykh Kirill Sergeevich
  • Shipulin Aleksandr Vladimirovich
RU2522327C2

RU 2 330 954 C1

Authors

Shipulin Aleksandr Vladimirovich

Dates

2008-08-10Published

2007-01-10Filed