FIELD: oil and gas industry.
SUBSTANCE: casting method of cementing consists in gasified cement injection in casing pipe, two-stage squeezing into hole clearance considering gasified cement degassing while it is activated in borehole cavity, as well as considering gasified cement compressibility in thermobaric borehole environment. Improved gasified cement-bond in borehole is ensured by defect breakdown at the first stage of structure formation (activation) of gasified cement suspension owing to staged squeezing of gasified cement considering its stability.
EFFECT: improved gasified cement-bond in borehole.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR STEP-BY-STEP WELL GROUTING | 1991 |
|
RU2038462C1 |
METHOD FOR STEPPED CEMENTATION OF WELL IN HIGHLY PENETRABLE GAS-SATURATED COLLECTORS | 2003 |
|
RU2241819C1 |
METHOD OF CEMENTATION TOP STAGE OF CASING PIPE IN WELL | 2008 |
|
RU2386013C1 |
METHOD OF CEMENTING CASING PIPE OF GAS WELL UNDER CONDITIONS OF PERMAFROST ROCKS | 2006 |
|
RU2342517C2 |
METHOD OF STEPWISE CEMENTING OF CASINGS | 0 |
|
SU829875A1 |
METHOD OF STAGE-WISE CEMENTING OF CASINGS | 0 |
|
SU947390A1 |
METHOD OF CEMENTING WELLS USING CEMENTING HEAD | 0 |
|
SU1379449A1 |
WELL CEMENTING METHOD | 2022 |
|
RU2797167C1 |
METHOD OF SECURING A HIDDEN CASING STRING OF A BOREHOLE WITH ROTATION AND CEMENTING OF THE ZONE ABOVE THE PRODUCTIVE FORMATION | 2020 |
|
RU2745147C1 |
METHOD AND APPARATUS FOR ISOLATING FORMATIONS IN REINFORCING OF WELLS | 0 |
|
SU1548407A1 |
Authors
Dates
2009-01-27—Published
2007-06-04—Filed