FIELD: mining.
SUBSTANCE: method includes development of blind ore deposit under guarded object located on earth surface. Before commencement of works there are defined parameters of developed area which facilitates a uniform stress field. Ore body is divided into stories; preparing-cutting, drilling and under-cutting mine workings are performed on the stories; then there is performed excavation of stores of an upper story within the boundaries of the defined contour by system with open developed area. A preventing cushion is left in funnels of outlet. Stores of a lower story are worked out with chambers where temporary stoops are left. Stores of the chamber are destroyed onto compensation slot worked out in the central part of the chamber. The chamber is undercut with a high trench undercutting the tilt angles of borders of which are equal to not less, than natural ore slope value. Ore massif is drilled around with rows of boreholes arranged in a fan shape. By explosion of not charged upper parts of boreholes the upper part of the chamber is arc shaped.
EFFECT: facilitating more complete ore excavation at development and facilitating safety of mining operations.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MINING BLIND OREBODIES UNDER PROTECTED OBJECTS | 1998 |
|
RU2147683C1 |
METHOD FOR MINING OF INCLINED ORE BODIES | 1994 |
|
RU2069755C1 |
METHOD FOR MINING INCLINED ORE DEPOSITS | 0 |
|
SU1789025A3 |
DEVELOPMENT METHOD OF ORE DEPOSITS WITH BLOCK CAVING SYSTEM WITH ACTIVE FLEXIBLE SEPARATING COVERING | 2009 |
|
RU2426881C1 |
METHOD FOR WORKING OF STEEPLY DIPPING ORE BODIES | 0 |
|
SU1775558A1 |
DEVELOPMENT METHOD OF THICK STEEPLY DIPPING ORE BODIES | 2012 |
|
RU2502872C1 |
METHOD FOR WORKING THICK ORE DEPOSITS | 0 |
|
SU901529A1 |
METHOD FOR MINING ORE DEPOSITS | 0 |
|
SU1789698A1 |
METHOD FOR EXTRACTION OF STEEP-FALLING DEPOSITS OF WEAK ORES | 2003 |
|
RU2248448C1 |
DEVELOPMENT METHOD OF BLIND ORE DEPOSITS | 2009 |
|
RU2415267C1 |
Authors
Dates
2009-03-20—Published
2007-06-29—Filed