FIELD: oil and gas industry.
SUBSTANCE: invention refers to methods of restriction of bottom water and annulus overflows in production wells. The method consists in pumping water and solution of sodium naphthenate into a well; then the procedure is repeated not less, than 3 times; also cement solution is pumped with addition of sodium naphthenate; while initially solution of sodium naphthenate and water is pumped and then additionally alumo-chloride is pumped. Volume ratio of sodium naphthenate and alumo-chloride can be 4:1.
EFFECT: upgraded efficiency of method due to effect of hydrophobisation of porous space, increased amount of forming cementing material, thermo-stabilisation of this material under conditions of high temperatures of bed (above 80°C) and creating more reliable isolation screen.
2 cl, 2 tbl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR RESTRICTING BOTTOM WATER AND ANNULUS BLOWOUTS IN PRODUCTION WELLS | 2000 |
|
RU2172825C1 |
COMPOSITION FOR INSULATING WATER-INFLOW AND OVER-COLUMN OVERCURRENT OF PETROLEUM AND GAS | 2006 |
|
RU2304160C1 |
LINING METHOD OF BOTTOM-HOLE ZONE OF PRODUCTIVE FORMATION OF GAS WELLS | 2011 |
|
RU2475622C1 |
COMPOUND FOR ISOLATION OF BRINE WATER IN WELL | 1999 |
|
RU2137905C1 |
FORMATION WATER ISOLATION METHOD | 2005 |
|
RU2280757C1 |
METHOD FOR SELECTIVE TREATMENT OF BED | 2003 |
|
RU2236559C1 |
BACKFILL COMPOSITION FOR SELECTIVE RESTRICTION OF WATER INFLOW IN EXTRACTION WELLS | 2009 |
|
RU2391378C1 |
SLUDGE-FORMING FOR CONTROL OF WELL INPUT PROFILE | 2013 |
|
RU2527424C1 |
METHOD OF REPAIR-INSULATION WORKS IN OIL AND GAS WELL | 2019 |
|
RU2723416C1 |
METHOD OF FASTENING BOTTOM-HOLE ZONE OF RESERVOIR | 2019 |
|
RU2724828C1 |
Authors
Dates
2009-03-27—Published
2006-12-06—Filed