PROCEDURE OF TREATMENT OF WELL BOTTOMHOLE ZONE Russian patent published in 2009 - IPC E21B43/16 

Abstract RU 2355879 C1

FIELD: mining.

SUBSTANCE: invention refers to mining and can be implemented for development and recovery of producing wells yield reduced because of bottomhole mudding with asphaltic-resinous-paraffin formations and mechanical impurities. The object of the invention is generating periodic pulses of pressure in the bottomhole zone of a reservoir with regulated amplitude and frequency characteristics for each alternating stage of well treatment. The essence of the invention is as follows: the procedure consists in pumping fluid into the cavity of the well, in creating depressive drop of pressure between the bottomhole zone and the cavity of the well by means of generating periodic pulses of pressure in the bottomhole zone in form of a shock wave moving along the cavity of the well; the shock wave is formed, when the cavity of the well at the well head is periodically opened to let well fluid under pressure drain and then it is shut off with valves. One of the valves is a drain valve. It communicates the well cavity with a drainage capacity. The second valve is a fluid filling valve. It facilitates connection with a fluid source under pressure. The fluid drain valve performs opening and shutting off the well cavity at the well head for draining well fluid under pressure. Periodically pressure in the well is raised connecting the well head with the fluid source under pressure by means of opening the fluid filling valve. According to the invention at the stage of removing mechanical and hydrocarbon formations there is performed quick drain valve opening and comparatively slow shutting off to create depression, facilitating implosion extraction of mud out of botomhole thickness, and to create repression preventing mud reverse moving. At the stage of working agent supply into an interval of perforation there is performed drain fluid opening and quick shutting off for creating repressive pulses of pressure facilitating expansion of fractures when working agent penetrates them. At the stage of removing working agent and products of chemical reaction from the bottomhole zone again there is performed drain valve quick opening and slow shutting off for implosion extraction of residual mud out of bottomhole zone thickness. Also frequency of pulses at mud removal is chosen providing resonant swinging of well fluid column and maximum value of depression amplitude, and during fractures expanding - also providing working agent moving in fractures to flush off rock of the bottomhole zone from hydrocarbon film.

EFFECT: new procedure of well bottomhole zone treatment.

Similar patents RU2355879C1

Title Year Author Number
PROCESSING METHOD OF BOTTOMHOLE ZONE 2006
  • Shipulin Aleksandr Vladimirovich
RU2327027C2
TREATMENT METHOD FOR BOTTOMHOLE ZONE OF WELL EQUIPPED WITH BOTTOM-HOLE OIL PUMP 2012
  • Kupavykh Kirill Sergeevich
  • Shipulin Aleksandr Vladimirovich
RU2511167C1
METHOD OF TREATMENT OF WELL BOTTOMHOLE ZONE 2007
  • Shipulin Aleksandr Vladimirovich
RU2349747C1
TREATMENT METHOD OF BOTTOMHOLE ZONE 2012
  • Kupavykh Kirill Sergeevich
  • Shipulin Aleksandr Vladimirovich
RU2522327C2
PROCEDURE OF WELL BOTTOMHOLE ZONE TREATMENT 2008
  • Shipulin Aleksandr Vladimirovich
RU2383720C1
TREATMENT METHOD OF BOTTOM-HOLE ZONE 2011
  • Shipulin Aleksandr Vladimirovich
RU2471976C1
METHOD FOR FORMATION WELL BORE ZONE TREATMENT 2012
  • Shipulin Aleksandr Vladimirovich
RU2511220C2
METHOD FOR FORMATION WELL BORE ZONE TREATMENT 2010
  • Shipulin Aleksandr Vladimirovich
RU2444620C1
METHOD OF PERFORMING PULSED HYDRAULIC FRACTURING 2021
  • Shipulin Aleksandr Vladimirovich
RU2768311C1
PULSED HYDRAULIC FRACTURING METHOD 2020
  • Shipulin Aleksandr Vladimirovich
RU2737632C1

RU 2 355 879 C1

Authors

Shipulin Aleksandr Vladimirovich

Dates

2009-05-20Published

2007-08-14Filed