DEPRESERVATION METHOD OF OIL AND GAS WELL WITH NON-TIGHT PRODUCTION CASING WHEN PERMAFROST FORMATIONS ARE AVAILABLE IN SECTION Russian patent published in 2010 - IPC E21B43/00 

Abstract RU 2378493 C1

FIELD: oil and gas production.

SUBSTANCE: invention refers to depreservation of gas, gas-condensate and oil wells located in the area of permafrost formations generally distributed in the section and preserved with installation method of cement plugs thus leaving clay drilling fluid in well bore and with well-control equipment and casing head available on hole mouth, which have been preserved for a long time and having non-tight production casing and big colmataged area, namely to depreservation of pioneer wells. During depreservation of oil and gas well with non-tight production casing when permafrost formations are available in the section there performed is visual inspection of hole mouth and adjacent territory, cone near mouth is filled with ground, steering wheels and pressure gauges are installed on well-control equipment and casing head, well-control equipment and casing head are heated to positive temperature within 20-30°C, pressure is checked in well-control equipment and in well tubing-casing annuli, they are pressure tested with explosion-proof mixture with nitrogen content within 92-95%, well-control equipment is removed, blowout equipment with well flushing equipment system is mounted, well production casing is heated with hot saline solution with density providing backpressure on the bed and with temperature of 60-80°C to cement plug installed in well production casing above productive bed for the period of its preservation, actual location of cement plug is determined, well production casing is interval gauged and pressure tested to cement plug on saline solution considering its density, intervals and degree of leakage of well production casing is determined with geophysical methods, injection capacity is determined with pressure created in well bore and influx is determined with level recession method, plugging material or sealing composition is installed below leakage interval of insulation cement plug and pumped behind production casing through leakage interval of well production casing, leakage interval of well production casing is set up with method of adding insulation bridge with additional portion of cement grout, the well is kept for the curing period of plugging material or sealing composition behind well production casing and cement in the added part of insulation cement bridge, insulation cement bridge is drilled in leakage interval of well production casing, repeated pressure test of the well production casing is performed, there drilled is cement bridge installed in well production casing above productive bed, on saline solution, with density providing backpressure on the bed, and with temperature of 20-30°C, well production casing is flushed to the well bottom, declaying of colmataged area of productive bed is performed by installing alkaline bath with further flushing and installation of acid bath, recovering of gas dynamic coupling of the well with productive bed is performed with perforation charges of low mining effect with deep penetration and formation of channels protruding beyond the intervals of colmataged area, swabbing from productive bed is performed; at that, pressure of pressure test of production casing with saline solution on hole mouth is determined by formula.

EFFECT: recovering the gas dynamic coupling of the well with productive bed when restoring technical state of the well.

8 cl, 5 dwg

Similar patents RU2378493C1

Title Year Author Number
RE-ACTIVATION OF WELL 2007
  • Kustyshev Aleksandr Vasil'Evich
  • Kustyshev Igor' Aleksandrovich
  • Kazakov Evgenij Gennad'Evich
  • Shenberger Vladimir Mikhajlovich
  • Krjakvin Dmitrij Aleksandrovich
  • Nemkov Aleksej Vladimirovich
  • Kustyshev Denis Aleksandrovich
  • Chizhov Ivan Vasil'Evich
RU2349734C2
METHOD OF WELL RE-ACTIVATION (VERSIONS) 2007
  • Kustyshev Aleksandr Vasil'Evich
  • Kustyshev Igor' Aleksandrovich
  • Vaganov Jurij Vladimirovich
  • Shenberger Vladimir Mikhajlovich
  • Krjakvin Dmitrij Aleksandrovich
  • Nemkov Aleksej Vladimirovich
  • Shatalov Dmitrij Aleksandrovich
  • Lesnichenko Andrej Gennad'Evich
  • Kochetov Sergej Gennad'Evich
RU2349733C2
GAS WELL CONSERVATION METHOD 2005
  • Kustyshev Aleksandr Vasil'Evich
  • Zozulja Grigorij Pavlovich
  • Kustyshev Igor' Aleksandrovich
  • Shcherbich Nikolaj Efimovich
  • Obidnov Viktor Borisovich
  • Kustyshev Denis Aleksandrovich
RU2301880C2
ABANDONMENT METHOD FOR WELL WITH GAS SHOW IN TUBING-CASING ANNULUS 2005
  • Kustyshev Aleksandr Vasil'Evich
  • Zozulja Grigorij Pavlovich
  • Kustyshev Igor' Aleksandrovich
  • Shcherbich Nikolaj Efimovich
  • Obidnov Viktor Borisovich
  • Lakhno Elena Jur'Evna
  • Kustyshev Denis Aleksandrovich
RU2305754C2
ABANDONMENT METHOD OF OIL-AND-GAS WELL LOCATED IN WATER AREA OF SHALLOW WATER RESERVOIR 2009
  • Dmitruk Vladimir Vladimirovich
  • Rakhimov Nikolaj Vasil'Evich
  • Kustyshev Igor' Aleksandrovich
  • Khozjainov Vladimir Nikolaevich
  • Tkachenko Ruslan Vladimirovich
  • Fedoseev Andrej Petrovich
  • Kustyshev Denis Aleksandrovich
  • Zhuravlev Valerij Vladimirovich
  • Leont'Ev Dmitrij Sergeevich
  • Kustyshev Aleksandr Vasil'Evich
RU2418152C1
METHOD OF OIL AND GAS WELL ABANDONMENT WITH MULTIPLE UNSEALED INTERVALS IN OPERATION COLUMN IN ROUGH TERRAIN 2010
  • Kostenjuk Sergej Alekseevich
  • Kustyshev Igor' Aleksandrovich
  • Kustyshev Denis Aleksandrovich
  • Afanas'Ev Akhnaf Vasil'Evich
  • Chizhov Ivan Vasil'Evich
  • Shatalov Dmitrij Aleksandrovich
  • Kustyshev Aleksandr Vasil'Evich
RU2439288C1
METHOD OF ABANDONMENT OF OIL-AND-GAS WELL WITH PRODUCTION STRING MULTIPLE UNTIGHT SECTIONS 2010
  • Kustyshev Igor' Aleksandrovich
  • Kustyshev Denis Aleksandrovich
  • Chizhov Ivan Vasil'Evich
  • Afanas'Ev Akhnaf Vasil'Evich
  • Rakhimov Stanislav Nikolaevich
  • Kustyshev Aleksandr Vasil'Evich
RU2441135C1
PROCEDURE FOR ABANDONMENT OF WELL WITH MULTITUDE OF INTERVALS OF PRODUCTION STRING LEAKAGE IN ZONE OF PERMAFROST ROCK 2010
  • Kustyshev Denis Aleksandrovich
  • Fedoseev Andrej Petrovich
  • Magomedova Misirina Kutuevna
  • Kustysheva Svetlana Aleksandrovna
RU2435935C1
PROCEDURE FOR ABANDONMENT OF WELL WITH MULTITUDE OF INTERVALS OF LEAKAGE OF PRODUCTION STRING 2010
  • Kustyshev Igor' Aleksandrovich
  • Khozjainov Vladimir Nikolaevich
  • Shatalov Dmitrij Aleksandrovich
  • Kustysheva Irina Nikolaevna
RU2436932C1
METHOD OF WELL ABANDONMENT WITH COLLAPSED PRODUCTION STRING 2009
  • Kustyshev Igor' Aleksandrovich
  • Kustyshev Denis Aleksandrovich
RU2403376C1

RU 2 378 493 C1

Authors

Krylov Georgij Vasil'Evich

Kustyshev Denis Aleksandrovich

Kustyshev Igor' Aleksandrovich

Rakhimov Nikolaj Vasil'Evich

Nemkov Aleksej Vladimirovich

Tkachenko Ruslan Vladimirovich

Vakorin Egor Viktorovich

Popova Zhanna Sergeevna

Dates

2010-01-10Published

2008-09-15Filed