FIELD: construction industry.
SUBSTANCE: fixed construction formwork includes soft cover with interconnected cells formed inside it and intended for being filled with solidified compound, and stiffeners. Cells have parallelepiped shape and are located along the whole formwork; at that, one of the sides of rectangle in cross section of cell corresponds to thickness of manufactured building structure, and stiffeners are installed between cells in inter-fabric slots along the whole cell and are made in the form of planks.
EFFECT: improving aesthetic and strength properties with simultaneous increase in labor efficiency when manufacturing formworks and simplifying the design.
3 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
RETAINED FORMS | 2006 |
|
RU2323308C1 |
REINFORCED CONCRETE FRAME OF BUILDING WITH PRECAST AND CAST-IN-SITU HIDDEN CROSSBAR | 2007 |
|
RU2357049C1 |
METHOD OF MULTI-STOREY BUILDING LIGHTENED FLOORS INSTALLATION | 2017 |
|
RU2652402C1 |
NON-DETACHABLE BUILDING FORMWORK (VERSIONS) | 2009 |
|
RU2423584C1 |
NON-DETACHABLE CONSTRUCTION CURB | 2012 |
|
RU2510635C2 |
SET OF BUILDING PROFILES FOR CONSTRUCTION OF FRAME STRUCTURE OF BUILDING OR STRUCTURE AND FRAME STRUCTURE OF BUILDING OR STRUCTURE USING A SET OF BUILDING PROFILES | 2017 |
|
RU2663857C1 |
THREE-CHAMBER WALL CONSTRUCTION PROFILE | 2018 |
|
RU2681747C1 |
STRUCTURE OF PRECAST FLOOR AND METHOD OF ITS ERECTION | 2008 |
|
RU2378461C1 |
PERMANENT FORMWORK FOR MONOLITHIC CONCRETE OR REINFORCED CONCRETE FROM INORGANIC GLASS (OPTIONS) | 2018 |
|
RU2668669C1 |
METHOD FOR ERECTION OF SOLID-CAST FRAME BUILDINGS | 2004 |
|
RU2353735C2 |
Authors
Dates
2010-01-27—Published
2008-08-11—Filed