PIPE CULVERT UNDER BANKED EARTH IN CONDITIONS OF NORTHERN CLIMATIC BUILDING ZONE AND OPERATION METHOD THEREOF Russian patent published in 2010 - IPC E01F5/00 

Abstract RU 2381328 C1

FIELD: road construction industry.

SUBSTANCE: invention refers to construction industry and can be used during installation of pipe culverts under banked earths in conditions of northern climatic building zone. Inlet head of water outlet pipe is provided with protective screen providing protection of the cavity at roof of pipe culvert from protective screen to outlet head, which is free of flooding ice and/or snow during cold season. Immediately before protective screen there installed is metal pipe the lower pipe of which envelopes protective screen and is hydraulically connected to upper part of cavity of pipe culvert, and upper part is located above predicted surface of flooding ice and/or snow and is equipped with two metal ribs. Each of those ribs has the shape of vertical plate the side surface of which is directed to the south. Inlet head can be of in-line type, and immediately before pipe culvert, it is equipped with covering which is located above roof of pipe culvert, and protective screen is attached to covering at the inlet and forms a cavity under covering, which is hydraulically connected to upper part of cavity with pipe culvert. Inlet head can contain tubular link which is higher than links of pipe culvert, and protective screen is attached to this tubular link at the inlet and forms a cavity inside tubular link, which is hydraulically connected to upper part of cavity with pipe culvert. Metal pipe is installed with inclination of 5-15 degrees north-wards and painted dark-red. When warm season begins, in metal tube there placed in specified quantity is unkilled lime and its slaking is performed with water till continuous melted channel is formed in flooding ice and/or snow around metal pipe and hydraulically connected at roof of pipe culvert with the cavity free of flooding ice and/or snow. In addition, sodium chloride is placed in metal pipe and water, mainly hot, is added.

EFFECT: simplifying pipe culvert operation at flooding ice and/or heavy snow transport available.

9 cl, 4 dwg

Similar patents RU2381328C1

Title Year Author Number
SECTION OF MOTOR ROAD WITH CULVERT UNDER EMBANKMENT IN CONDITIONS OF NORTHERN CONSTRUCTION-CLIMATIC ZONE 2009
  • Vajkum Vladimir Andreevich
  • Rudnov Valerij Mikhajlovich
  • Jagin Vasilij Petrovich
  • Grishin Vasilij Andreevich
RU2385983C1
CULVERT IN CONDITIONS OF PERMANENTLY FROZEN SOILS ON PERIODIC WATER COURSE 2008
  • Jagin Vasilij Petrovich
  • Vajkum Vladimir Andreevich
  • Rudnov Valerij Mikhajlovich
  • Gorbacheva Elena Valentinovna
RU2375519C1
CULVERT UNDER BANKED EARTH IN CONDITIONS OF PERMANENTLY FROZEN GROUNDS IN PERIODIC WATER COURSE 2008
  • Jagin Vasilij Petrovich
  • Rudnov Valerij Mikhajlovich
  • Vajkum Vladimir Andreevich
RU2381327C1
RIVERBED-DIVERSION STRUCTURE OF SEASONAL WATERWAY ON PERMAFROST 2008
  • Jagin Vasilij Petrovich
  • Vajkum Vladimir Andreevich
  • Rudnov Valerij Mikhajlovich
RU2382139C1
CULVERT UNDER BANK 2008
  • Jagin Vasilij Petrovich
  • Vajkum Vladimir Andreevich
RU2373329C1
CULVERT UNDER EMBANKMENT IN PERMAFROST SOILS AT PERIODICALLY OPERATING WATERWAY 2008
  • Vajkum Vladimir Andreevich
  • Jagin Vasilij Petrovich
  • Rudnov Valerij Mikhajlovich
RU2370590C1
ROCK AND EARTH DAM 2011
  • Jagin Vasilij Petrovich
RU2474645C1
HYDROTECHNICAL CHANNEL UNDER CONDITIONS OF PERMAFROST SOILS OF SLOPE 2009
  • Trojan Natal'Ja Sergeevna
  • Jagin Vasilij Petrovich
RU2392376C1
ROCK AND EARTH DAM 2011
  • Jagin Vasilij Petrovich
RU2474646C1
CULVERT UNDER EMBANKMENT 2022
  • Pinchuk Petr Stepanovich
  • Shcherbakov Vladimir Vasilevich
  • Komyagin Sergej Anatolevich
  • Pashtykov Artem Vitalevich
RU2803753C1

RU 2 381 328 C1

Authors

Jagin Vasilij Petrovich

Rudnov Valerij Mikhajlovich

Dates

2010-02-10Published

2009-01-19Filed