FIELD: chemistry.
SUBSTANCE: method involves treatment of gypsum-containing briquetted material with saturated steam at pressure 1.3 atm with subsequent drying. Before filling an autoclave with saturated steam at pressure 1.3 atm, the volume of the autoclave is evacuated for 20 minutes with briquets moulded from the starting material loaded in it.
EFFECT: cutting duration of autoclaving.
1 tbl, 2 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PREPARING GYPSUM BINDER IN AUTOCLAVE | 0 |
|
SU578277A1 |
PROCESS FOR MANUFACTURE OF GYPSUM BINDER | 1990 |
|
RU2023699C1 |
METHOD OF PREPARATION OF GYPSUM MOULDING SAND | 0 |
|
SU1503170A1 |
METHOD OF PREPARING HIGH-STRENGTH GYPSUM BINDER | 2002 |
|
RU2212384C1 |
METHOD OF GYPSUM ARTICLE MAKING | 1997 |
|
RU2132310C1 |
METHOD TO PRODUCE WATERPROOF GYPSUM PRODUCTS | 2014 |
|
RU2540731C1 |
METHOD OF MANUFACTURING GYPSUM ARTICLES | 1983 |
|
SU1205493A1 |
0 |
|
SU217374A1 | |
HIGH-STRENGTH GYPSUM PRODUCTION METHOD | 2004 |
|
RU2270813C2 |
GYPSUM BINDER PREPARATION METHOD | 2002 |
|
RU2210540C1 |
Authors
Dates
2010-02-20—Published
2008-03-28—Filed