FIELD: construction.
SUBSTANCE: prefabricated structure of semi-annular or longitudinally oblong form consists of elements put on two bracing ropes. On side surface of extreme element there made is bracing device in the form of a winch on the reel of which there output are ends of bracing ropes. Inside the above element there made is rotary roller on which the ropes bend at straight angle. Assembly is made by using two arches with bracing rope and the upper points of which are fixed with a pin. Arches, one of which is larger than the other one, are located in intersecting planes perpendicular to the plane of base and with an offset from perpendicular position relative to each other. There proposed is erection method of arched structure by using an assembly.
EFFECT: reducing labour input during erection of the structure.
3 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
TRANSFORMABLE ARCHED STRUCTURE WITH FLEXIBLE FENCING | 0 |
|
SU1686104A1 |
DEMOUNTABLE ARCHED STRUCTURE AND ATTACHMENT POINT OF SHAPED MEMBER TO FOUNDATION, WHICH IS USED IN THIS STRUCTURE | 2014 |
|
RU2566881C1 |
COLLAPSIBLE TENT CONSTRUCTION | 1991 |
|
RU2037016C1 |
ERECTION METHOD OF TIMBER HOUSES, CONSTRUCTIONS, STRUCTURES | 2009 |
|
RU2399729C1 |
METHOD OF MOUNTING FRAME-ARCHED STRUCTURE | 2015 |
|
RU2597216C1 |
PREFABRICATED SKELETON OF DOME STRUCTURE | 0 |
|
SU1201444A1 |
SECTIONAL STRUCTURE | 0 |
|
SU656541A3 |
DETACHABLE PREFABRICATED METAL FRAMEWORK | 0 |
|
SU723063A1 |
GREENHOUSE | 2015 |
|
RU2612635C1 |
SECTIONAL METAL FRAME | 0 |
|
SU796338A1 |
Authors
Dates
2010-03-27—Published
2008-11-10—Filed