FIELD: oil-and-gas production.
SUBSTANCE: method is based on creation of pressure in oil-bearing strata ensured by laying of charges and its simultaneous blasting in oil development wells located by perimetres of waste oil field. Additionally charge laying is implemented by perimetre of oil field next nearest. Then it is implemented blasting simultaneously in all wells of enabled perimetres. Pumping of free oil is implemented through wells located by spare earlier perimetres of waste oil field.
EFFECT: effectiveness increase of petroleum production.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF WITHDRAWAL OF OIL FROM WORKED OUT OIL DEPOSITS | 2007 |
|
RU2362873C2 |
METHOD FOR WELL PRODUCTION FROM EXHAUSTED OIL FIELDS | 2006 |
|
RU2305178C1 |
METHOD FOR INCREASING RESERVOIR RECOVERY BY DYNAMIC FORMATION ACTION | 2018 |
|
RU2691794C1 |
METHOD FOR PRODUCTION OF OIL OR GAS | 1992 |
|
RU2066741C1 |
ASSEMBLY AND METHOD FOR PROLONGATION OF EXPLOITATION LIFE OF OIL FIELDS | 1993 |
|
RU2098614C1 |
METHOD FOR RECOVERY OF RESIDUAL OIL RESERVES | 2012 |
|
RU2511151C2 |
METHOD OF INCREASING OIL RECOVERY | 1996 |
|
RU2122109C1 |
OIL PRODUCTION COMPLEX | 2008 |
|
RU2377397C1 |
METHOD OF MINE-TYPE WORKING OF OIL DEPOSIT | 0 |
|
SU929821A1 |
TERTIARY OIL DISPLACEMENT METHOD | 2023 |
|
RU2809858C1 |
Authors
Dates
2010-04-10—Published
2008-09-12—Filed