METHOD FOR PHASED COMPLEX ENGINEERING PROTECTION OF GENERAL PLANNING EMBANKMENT Russian patent published in 2010 - IPC E02B11/00 

Abstract RU 2390605 C1

FIELD: construction.

SUBSTANCE: invention relates to the field of hydrotechnical and land reclamation construction and is intended to provide for stability of soils in general planning embankments of developed lands. Method includes development of general planning embankment on site of developed territory and performance of protective measures in two stage, the first of which - in initial period of construction to provide for embankment fitness for performance of construction works in normal mode, and the second one - in final period of construction to provide for stability of embankment soils in process of its whole service life. At the first stage embankment is filled in several stages. At the first stage pioneer bed of embankment is formed, which is filled in layers in winter period of time during the first year of construction onto surface of formed layer of seasonal frost penetration cleaned from snow by layers having thickness that provides for the possibility of their additional compaction. If general planning embankment is erected from water-saturated soils, filling of embankment on the site of developed territory is carried out in separate sections of rectangular shape in plan. Separate sections of embankment are erected without their mutual merging, thus creating channels between separate sections of embankment for waters drain in warm period of the year. Neighbouring separate sections of embankment are joined by embankment passages arranged across mentioned channels to provide for free change-over of construction equipment from one section of embankment to another one. Culverts are arranged in embankment passages. At the second stage - in subsequent summer period of time in the second year of construction, after pioneer bed of embankment has melted down to the depth that equals 70-80% of its thickness, its additional compaction is started, besides additional compaction of embankment pioneer bed is completed to the moment of melting for the whole thickness and prior to beginning of melting in soils of natural origin that are arranged under pioneer bed. Another layer of embankment, second in height, is filled with layer compaction and filling of channels for water drain. Thickness of embankment layer second in height is arranged as not exceeding difference between value of rated depth of filled soils melting in this climatic region and value of thickness of embankment pioneer bed. If value of overall height of general planning embankment exceeds value of rated depth of seasonal melting for filling soils used for its erection, at another stage - another bed of embankment, next in height, with thickness of not more than rated depth of melting for filling soils is filled in winter period of time onto surface of embankment, preceding in height, cleaned from snow, after its complete frost penetration. Filled bed of embankment is also additionally compacted in summer period of time after its melting to the depth equal to 70-80% of its thickness. Further subsequent stages are repeated until general planning embankment is not brought till design height. At the second stage for protection of general planning embankment for the whole of its service life against water saturation with thawed and rain waters, and also with waters that arrive from adjacent territory, at the last stages of general planning embankment filling, measures are taken for organisation of long-term water-removal system and anti-filtration devices.

EFFECT: invention provides for stable condition of soils in general planning embankment at all stages of its existence.

9 cl, 3 dwg

Similar patents RU2390605C1

Title Year Author Number
METHOD FOR COMPLEX MULTILAYER ENGINEERING PROTECTION OF TERRITORY TO BE DEVELOPED AGAINST UNDERFLOODING 2004
  • Kutvitskaja N.B.
  • Rjazanov A.V.
  • Borozinets V.E.
  • Shekhovtsov A.V.
  • Minkin M.A.
RU2249072C1
EARTH DAM 2013
  • Kuznetsov Georgij Ivanovich
  • Balatskaja Natal'Ja Vladimirovna
RU2528700C1
EARTHWORK ON PERMAFROST SOILS AND METHOD OF ITS ERECTION WITH BASE REINFORCEMENT IN AREAS OF PERMAFROST PROPAGATION 2010
  • Bedrin Evgenij Andreevich
  • Zav'Jalov Aleksandr Mikhajlovich
  • Popov Viktor Panfilovich
  • Lonskij Vladimir Nikolaevich
RU2443828C1
METHOD OF CONSTRUCTING A CANAL 0
  • Papernov Iosif Markovich
  • Savenko Leonid Petrovich
  • Kuznetsov Rostislav Veniaminovich
  • Lazar Aleksandr Yakovlevich
  • Samojlov Anatolij Dmitrievich
  • Feldman Yurij Samuilovich
  • Gorbachev Yurij Sergeevich
SU1063914A1
METHOD FOR ERECTION OF EMBANKMENT ON FROZEN SOILS 2008
  • Trofimov Valerij Ivanovich
  • Kondrat'Ev Valentin Georgievich
RU2378446C2
DRAINING POWER MEMBRANE (VERSIONS) 2006
  • Mukhametdinov Kharis Kas'Janovich
RU2323382C1
ROAD EMBANKMENT OVER PERMANENTLY FROSEN SOILS 2006
  • Ashpiz Evgenij Samuilovich
  • Lukin Igor' Petrovich
  • Khrustalev Lev Nikolaevich
  • Sholin Vjacheslav Vasil'Evich
RU2324032C1
ROADBED AND ROADBED FORMING METHOD 2005
  • Lutskij Svjatoslav Jakovlevich
  • Ashpiz Evgenij Samuilovich
  • Dolgov Denis Vladimirovich
RU2273687C1
METHOD TO ERECT DIKE DAM ON ARCTIC SEA SHORE 2011
  • Gubajdullin Marsel' Galiullovich
  • Konjukhov Aleksandr Vladimirovich
  • Ambarov Valerij Vjacheslavovich
  • Konjukhov Dmitrij Aleksandrovich
RU2453653C1
EMBANKMENT ON FROZEN SOIL 2008
  • Trofimov Valerij Ivanovich
  • Kondrat'Ev Valentin Georgievich
RU2360063C1

RU 2 390 605 C1

Authors

Rjazanov Aleksandr Viktorovich

Kutvitskaja Natal'Ja Borisovna

Minkin Mark Abramovich

Andreev Oleg Petrovich

Salikhov Zul'Far Salikhovich

Minigulov Rafail' Minigulovich

Korytnikov Roman Vladimirovich

Lysov Valerij Ivanovich

Rudenko Viktor Ivanovich

Jakhontov Dmitrij Aleksandrovich

Dates

2010-05-27Published

2008-12-08Filed