FIELD: mining.
SUBSTANCE: long blind drift ventilation method involves drilling of the main and additional wells in a pillar between adjacent and blind drifts; development of the cavity connecting the main and additional wells; air supply via the main well from fan or other draft source from adjacent drift to blind one; air ejection via additional wells from adjacent drift to blind drift. For more qualitative mixture of active (inducing) and passive (induced) jets the created cavity has bigger length and is made in the form of cone - diffuser.
EFFECT: increasing the jet head, flow continuity and its hydrodynamic stability, increasing system ejection coefficient.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
BLIND MINE WORKING AIRING METHOD | 0 |
|
SU840394A1 |
EJECTOR FOR MINE VENTING | 2006 |
|
RU2318119C2 |
INSTALLATION FOR BLOWING VENTILATION OF DEAD WORKING FACES | 2010 |
|
RU2428568C1 |
METHOD OF REGULATING OF EJECTOR FAN | 2000 |
|
RU2186986C2 |
EJECTING PLANT FOR CONTROL OVER DISTRIBUTION OF AIR IN VENTILATION SYSTEMS | 1996 |
|
RU2109958C1 |
VENTILATION EJECTING PLANT | 1991 |
|
RU2030590C1 |
EJECTOR FOR AIRING VIA WELL | 2010 |
|
RU2449128C1 |
EJECTOR VENTILATION PLANT | 1993 |
|
RU2067179C1 |
METHOD FOR VENTILATION OF EXTRACTION AREA WHEN REVERSE ORDER OF MINING OF MINERAL SEAMS | 2022 |
|
RU2787763C1 |
VENTILATION EJECTING PLANT | 1991 |
|
RU2027013C1 |
Authors
Dates
2010-09-20—Published
2009-02-24—Filed