FIELD: oil-and-gas production.
SUBSTANCE: proposed method consists in that, first, bench is hydraulically fractured by hydraulic fracturing fluid to produce preset-length development fracture. Then hydraulically active fluid is pumped in the well and forced, by chaser, into the bench, formed fracture and adjoining rock pores. Said chaser reacts with water and suspension of aluminium-containing material activated by at least gallium, in anhydrous fluid-carrier to cause thermo baric effect on the bench so that rocks and fluid contained therein are heated by 20°C and higher due to decrease in oil viscosity to below 10 MPa·s, fluidising of paraffinic and asphaltene-pitchy hydrocarbons, extraction of gas-phase products and formation of asset of additional micro fractures branched off produced development hydraulic fracturing and communicated with the system of the bench natural fractures.
EFFECT: higher filtration properties of bench.
7 cl, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR IMPROVING HYDRODYNAMIC CONNECTION WITH WELLS PRODUCING FORMATION | 2014 |
|
RU2580531C2 |
METHOD FOR INTENSIFICATION OF OIL PRODUCTION | 2023 |
|
RU2801968C1 |
METHOD FOR IMPROVEMENT OF HYDRODYNAMIC COMMUNICATION OF WELL WITH PRODUCTIVE FORMATION | 2011 |
|
RU2485296C1 |
METHOD FOR IMPROVEMENT OF HYDRODYNAMIC CONNECTION OF WELL WITH PRODUCTIVE FORMATION | 2011 |
|
RU2462590C1 |
INTENSIFICATION METHOD FOR WELL OPERATION | 2019 |
|
RU2720717C1 |
METHOD OF INTENSIFICATION OF WELL OPERATION AFTER ITS CONSTRUCTION | 2019 |
|
RU2705643C1 |
METHOD OF HYDRAULIC FRACTURING OF OIL, GAS OR GAS-CONDENSATE FORMATION | 2019 |
|
RU2723817C1 |
METHOD FOR TREATING BOTTOMHOLE AND REMOTE ZONES OF OIL AND GAS BEARING FORMATION | 2023 |
|
RU2813270C1 |
DEVELOPMENT METHOD OF BOTTOM-HOLE FORMATION ZONE | 2009 |
|
RU2440490C2 |
METHOD OF FORMATION TREATMENT | 2001 |
|
RU2186206C2 |
Authors
Dates
2010-10-10—Published
2009-02-25—Filed