FIELD: construction.
SUBSTANCE: platform consists of separated joined modules that represent a power frame with flooring made of composite materials. Wear resistant antiskid coating is applied onto flooring. On each pile with the help of mechanical fixtures there is an adjustment element installed with the possibility of changing relative position of platform along vertical line and horizontal line in process of construction and operation, at the same time power frame is fixed with the help of fixtures to adjustment element.
EFFECT: possibility to adjust relative position of platform along vertical and horizontal line in process of operation.
2 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
FIRE-RESISTANT BEARING STRUCTURE (VERSIONS) | 2014 |
|
RU2581073C1 |
COLLAPSIBLE RAILWAY PLATFORM AND METHOD OF MOVEMENT THEREOF | 2019 |
|
RU2725972C1 |
QUICK-ERECTING PLATFORM | 2020 |
|
RU2733671C1 |
STAIRCASE | 2009 |
|
RU2403354C1 |
COLLAPSIBLE UNIVERSAL BRIDGE | 2014 |
|
RU2578231C1 |
MULTIPURPOSE GREENHOUSE | 2012 |
|
RU2583627C2 |
FLOATING LANDING STAGE | 2006 |
|
RU2323121C1 |
COMPOSITE FLOORING | 2009 |
|
RU2403336C1 |
TRANSPORT SLEDGE | 2019 |
|
RU2713119C1 |
SCAFFOLDING CONSTRUCTION | 2015 |
|
RU2710582C2 |
Authors
Dates
2010-11-10—Published
2009-04-29—Filed