FIELD: mining.
SUBSTANCE: method includes filling gaps with the help of flexible curb, which is a tight container sewn from hose of strong watertight cloth, shaped as a sack or bag closed at both ends. Valves with holes are installed in upper corners of flexible curb. One valve is intended to feed cement-containing mixture into the container, and the second one - for air outlet from filled space. The flexible curb is evenly laid behind course strengthening space, and cement-containing material is injected through one of valves, at the same time air is exhausted from filled space via the other valve.
EFFECT: high-quality and efficient filling of gaps in mining courses.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR COMBINED BACKFILLING OF SUPPORT SPACE | 2012 |
|
RU2498072C1 |
METHOD FOR FILLING IN DESCENDING EXTRACTION OF MINERAL BY STOPES | 1994 |
|
RU2069765C1 |
METHOD OF LAYING RUBBISH IN EXTRACTING MINERALS IN BILATERAL ENTRIES | 0 |
|
SU1726769A1 |
MINE PARTITION ERECTING METHOD | 0 |
|
SU883522A1 |
MINE CONNECTORS CONSTRUCTION METHOD | 2017 |
|
RU2677186C1 |
FLOATING FORM | 0 |
|
SU748018A1 |
METHOD OF WORKING STEEPLY DIPPING BEDS | 0 |
|
SU1710744A1 |
METHOD OF CHECKING COMPLETENESS OF WASTE STOWING | 0 |
|
SU1201526A1 |
ROCK PRESSURE CONTROL METHOD | 0 |
|
SU1765401A1 |
METHOD OF HYDROMINING OPERATIONS | 2007 |
|
RU2334876C1 |
Authors
Dates
2011-04-27—Published
2009-08-24—Filed