FIELD: oil and gas industry.
SUBSTANCE: insulating compound of cavernous part of well shaft, mainly hollow and horizontal ones, includes the following, wt %: powdered sulphonated melamineformaldehyde product 38.5-49.5; curing agent (on dry basis): aluminium chloride 1.8-3.6 or aluminium sulphate 3.8-4.2, or formic acid 0.8-2.6, or chlorhydric acid 1.3-3.6; plasticising agent- mixture of dioxane spirits with mass fraction of hydroxyl groups within 15-36 wt % (on dry basis) 5.0-20.0; mineralised water with density of not less than 1030 kg/m3 is the rest.
EFFECT: improving inhibition and adhesion properties of insulating compound at simultaneous reduction of process risk at execution of work owing to maintaining the flow property of compound during not less than 5 hours after components have been mixed under condition of its constant mixing, improving manufacturability owing to using powdered products, enlarging reagent base and shortening the preparation time.
4 cl, 2 tbl, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR PREPARATION OF GROUTING MORTAR FOR INSULATION AND PREVENTION OF EARTHFALLS IN CAVERNOUS PART OF SHAFT OF WELLS, AND MAINLY GENTLY SLOPING AND HORIZONTAL ONES | 2012 |
|
RU2489468C1 |
GROUTING MORTAR FOR CEMENTING HORIZONTAL HOLES | 2012 |
|
RU2508307C2 |
SPACER LIQUID USED IN CEMENTING OF CASING STRINGS | 2008 |
|
RU2378313C1 |
METHOD OF PREPARING HYDROPHOBIC EMULSION DRILLING MUD BY PHASE INVERSION TECHNIQUE FOR DRILLING LOW-ANGLE AND HORIZONTAL WELLS | 2012 |
|
RU2490293C1 |
METHOD OF HORIZONTAL WELL CONSTRUCTION IN SECTIONS OF UNSTABLE STRATA (VERSIONS) | 2012 |
|
RU2507371C1 |
PLUGGING MATERIAL FOR MAKING OF BRIDGES IN WELL DRILLED INVERTED-EMULSION DRILLING MUD (VERSIONS) | 2013 |
|
RU2525408C1 |
DRILLING FLUID FOR WELL CONSTRUCTION IN DIFFICULT CONDITIONS, MAINLY FOR DRILLING EXTENDED-REACH WELLS AND HORIZONTAL WELLS | 2008 |
|
RU2386656C1 |
GEL-FORMING CEMENTATION COMPOSITION FOR INSULATION CAVITY PART OF HOLE SHAFT DURING DRILLING PROCESSES | 0 |
|
SU1724855A1 |
COMPOSITION FOR INSULATING CAVERNOUS SECTION OF HOLE SHAFT | 0 |
|
SU1723307A1 |
PROCEDURE FOR STRENGTHENING UNSTABLE ROCK DURING DRILLING MAINLY INCLINED AND HORIZONTAL HOLES | 2010 |
|
RU2436826C1 |
Authors
Dates
2011-05-10—Published