FIELD: oil and gas production.
SUBSTANCE: procedure consists in supply of primary leaching solutions into treated object through system of evacuation downholes, in preparation of secondary active leaching solutions out of them directly in region of contact with treated object and in evacuation of productive solutions through system of evacuation downholes with successive extraction of valuable components from solutions. Intermediate solutions of two kinds are prepared out of primary leaching solutions before their pumping into downholes. Alkali solutions containing sodium hypochlorite are prepared in the electro-chemical reactor, while acid solutions containing hydrogen chloride and/or hydrogen peroxide with presence of hydroxyl-radicals in composition are prepared in the photo-electro-chemical reactor. Intermediate solutions are supplied into upper and lower parts of near-filter zone and/or with cyclic change of their supply into the upper part of the near-filter zone.
EFFECT: raised efficiency of leaching.
3 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD BOREHOLE CIL FROM DEEP LYING PLACERS AND MAN-MADE MINERAL FORMATIONS | 2012 |
|
RU2504648C1 |
METHOD OF WELL GOLD LEACHING FROM DEEP PLACERS | 2015 |
|
RU2609030C1 |
METHOD FOR EXTRACTING GOLD FROM ORES IN PLACE OF DEPOSITION THEREOF | 2003 |
|
RU2246002C1 |
METHOD OF UNDERSURFACE LEACHING OF GOLD AT AURIFEROUS ALLUVIALS | 1998 |
|
RU2118991C1 |
METHOD OF METAL EXTRACTION FROM ORES | 2013 |
|
RU2550764C1 |
METHOD OF HEAP-HOLE LEACHING OF GOLD FROM TECHNOGENIC MINERAL FORMATIONS OR SAND OF NON-DEEP PLACERS | 2013 |
|
RU2553811C2 |
METHOD OF RECOVERING PRECIOUS METALS FROM ORES | 1998 |
|
RU2137855C1 |
METHOD FOR LEACHING OF PRECIOUS METALS FROM TECHNOGENIC RAW MATERIAL | 2011 |
|
RU2474683C1 |
METHOD FOR PROCESSING OF MINERAL ORE CONTAINING GOLD AND SILVER AT SITE OF THEIR DEPOSITION | 1999 |
|
RU2146763C1 |
METHOD OF BATH-WELL LEACHING OF METALS | 2011 |
|
RU2475639C2 |
Authors
Dates
2011-07-10—Published
2009-06-29—Filed