FIELD: construction.
SUBSTANCE: device to form bore piles comprises a working element to create a well for a pile in the form of a hub with a cone tip, equipped with a helical blade, in the end of which on the hub there is a cone segment fixed at the angle of helical blade lift with its top towards it, and rigidly fixed by means of a tubular shaft with exhaust holes with an anchor, a helical blade of which has the same winding and pitch as the helical blade of the hub, the working element drive in the form of a hollow rotary stem, where there is a sleeve installed movably with a vibrator fixed on it, at the same time the lower end of the stem is connected with the tubular shaft of the working element, and the upper end of the stem, while the working element is being screwed, is connected to a source of gas-dynamic pulse, and after screwing - with the pump to supply soil-reinforcing mixture or concrete.
EFFECT: increased bearing capacity of bore piles.
1 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
SCREW PILE | 2007 |
|
RU2341620C1 |
DEVICE FOR FORMATION OF WELLS FOR FILLING PILES | 2011 |
|
RU2468148C2 |
DEVICE FOR FORMATION OF WELLS BY METHOD OF SOIL COMPACTION IN WELL WALL | 2010 |
|
RU2470119C2 |
DEVICE FOR HOLE BORING IN SOIL | 2011 |
|
RU2480570C1 |
SCREW INJECTION ANCHOR PILE | 2011 |
|
RU2489548C2 |
SCREW PILE | 2014 |
|
RU2570584C1 |
SCREW PILE | 2009 |
|
RU2413818C1 |
SCREW PILE | 2014 |
|
RU2564714C1 |
TELESCOPIC SCREW PILE WITH LEADER PILE | 2021 |
|
RU2763573C1 |
DEVICE FOR TRENCHLESS PIPELINE LAYING BY PERFORATION METHOD | 2004 |
|
RU2272874C2 |
Authors
Dates
2011-08-20—Published
2009-12-02—Filed