FIELD: oil and gas production.
SUBSTANCE: procedure for development of non-uniform reservoir consists in pumping water solution into reservoir. Solution contains wt %: poly-acryl-amide 0.3-1.0, chromium acetate 0.03-0.1, zinc oxide 0.03-0.1. Also, poly-acryl-amide and chromium acetate are mixed at ratio close to 10:1. Produced water solution is forced through into reservoir with water by volume exceeding volume of string, through which water is pumped, at not less, than 0.5 m3, with successive process conditioning for period of gelation of water solution.
EFFECT: raised efficiency of non-uniform reservoir development and reduced power expenditures.
1 tbl, 1 ex
Title | Year | Author | Number |
---|---|---|---|
PROCEDURE FOR DEVELOPMENT OF NON-UNIFORM RESERVOIR | 2010 |
|
RU2424426C1 |
METHOD FOR INJECTION WELL INFECTIVITY PROFILE ALIGNING AND WATER IN-FLOW LIMITATION FOR PRODUCTION WELL (VERSIONS) | 2009 |
|
RU2382185C1 |
DEVELOPMENT METHOD OF NON-HOMOGENEOUS OIL FORMATION | 2014 |
|
RU2541973C1 |
METHOD FOR DEVELOPMENT OF FLOODED OIL RESERVOIR WITH NON-UNIFORM PERMEABILITY | 2019 |
|
RU2722488C1 |
INJECTIVITY PROFILE CONTROL METHOD FOR INJECTION WELL AND WATER INFLUX RESTRICTION METHOD FOR PRODUCING WELL | 2005 |
|
RU2285785C1 |
METHOD FOR DEVELOPMENT OF OIL FORMATION WITH NON-UNIFORM PERMEABILITY | 2019 |
|
RU2725205C1 |
METHOD FOR DEVELOPMENT OF FLOODED OIL RESERVOIR WITH NON-UNIFORM PERMEABILITY | 2019 |
|
RU2719699C1 |
CONTROL METHOD OF WATER FLOODING OF NON-HOMOGENEOUS RESERVOIR BEDS OF DEPOSITS OF MINEFIELDS BY MEANS OF CROSS-LINKED POLYMER SYSTEMS WITH FILLER | 2009 |
|
RU2422628C1 |
METHOD OF LEVELING INJECTIVITY PROFILE OF INJECTION WELLS AND LIMITING WATER INFLOW TO PRODUCTION WELLS | 2016 |
|
RU2661973C2 |
OIL PRODUCTION METHOD | 2011 |
|
RU2485301C1 |
Authors
Dates
2011-10-20—Published
2010-04-20—Filed