FIELD: construction.
SUBSTANCE: landslide stabilisation method involves embedding of a number of piles into standing ground. Piles are drilled horizontally at an angle of 90 degrees to each other in two rows one above the other in staggered order on landslide slope or fall.
EFFECT: providing reliable stabilisation of landslide, reducing material consumption, simplifying the design as a whole and execution of work.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
ANTI-LANDSLIDE STRUCTURE FOR REINFORCEMENT OF ROAD EMBANKMENTS ON UNSTABLE SLOPES | 2019 |
|
RU2728046C1 |
METHOD TO PREVENT DEFORMATIONS OF LINEAR STRUCTURES ERECTED ON LANDSLIDE SLOPES OR MANMADE SLOPES ON MELTING PERMAFROST SOILS | 2014 |
|
RU2556646C1 |
ANTI-LANDSLIDE STRUCTURE | 1994 |
|
RU2074288C1 |
LANDSLIDE PROTECTION WORKS | 2010 |
|
RU2452816C1 |
LANDSLIDE PROTECTION WORKS | 2008 |
|
RU2380485C1 |
METHOD OF LANDSLIDE SLOPE CONSOLIDATION | 2000 |
|
RU2191866C2 |
ANTIMUDFLOW STRUCTURE | 0 |
|
SU1539262A1 |
LANDSLIDE CONTROL STRUCTURE | 2004 |
|
RU2272105C1 |
LANDSLIDE CONTROL STRUCTURE | 2002 |
|
RU2276232C2 |
COUNTER-SLIDE ARRANGEMENT | 0 |
|
SU990972A1 |
Authors
Dates
2011-12-20—Published
2010-01-19—Filed