FIELD: construction.
SUBSTANCE: drainage cassette comprises a cylindrical gabion from a flexible net filled with a filtering inertial filler, at the same time a perforated drainage pipe with water-receiving holes is arranged inside the cylindrical gabion, where it is rigidly fixed with the help of intermediate diaphragms, which have eye rings for transportation, at the edges the perforated drainage pipe is fixed with the help of end diaphragms, besides, the drainage cassette is made with the possibility of flexible connection by means of disconnecting sleeves with neighbouring drainage cassettes, the joint between which is protected with a plastic semi-ring against spillage of backfilling soil, and the outer surface of the drainage cassette is protected with a non-woven geotextile material, which is rigidly fixed at the edges to the perforated drainage pipe and the end diaphragm.
EFFECT: reduced time for drainage structures erection and their increased repairability.
4 dwg
Title | Year | Author | Number |
---|---|---|---|
TUBE DRAINAGE OF COMBINED DESIGN | 2022 |
|
RU2798218C1 |
ERECTION METHOD OF COMBINED DRAINAGE EARTH STRUCTURES | 2015 |
|
RU2601818C1 |
CULVERT FOR PROTECTION OF ROADS FROM LAND RUNOFF AND SEDIMENTS | 2017 |
|
RU2659438C1 |
METHOD FOR INSTALLATION OF CULVERT CONSTRUCTION FOR PROTECTION OF ROADS AGAINST LAND DRAINAGES AND BLANKETS | 2017 |
|
RU2659439C1 |
COMBINED DRAINAGE OF EARTHWORKS | 2015 |
|
RU2614072C1 |
CULVERT UNDER BANKED EARTH IN CONDITIONS OF PERMANENTLY FROZEN GROUNDS IN PERIODIC WATER COURSE | 2008 |
|
RU2381327C1 |
METHOD FOR ERECTING A TUBULAR DRAINAGE OF A COMBINED DESIGN | 2022 |
|
RU2800513C1 |
METHOD FOR ESTABLISHING UNDER-ROOM WATER INTAKE OF COMBINED STRUCTURE | 2020 |
|
RU2747490C1 |
METHOD OF ERECTION OF UNDERGROUND HORIZONTAL WATER INTAKE OF COMBINED STRUCTURE | 2012 |
|
RU2512031C2 |
HORIZONTAL UNDERGROUND WATER INTAKE OF COMBINED DESIGN | 2012 |
|
RU2518452C2 |
Authors
Dates
2012-01-10—Published
2010-08-23—Filed