FIELD: power engineering.
SUBSTANCE: method of air heating, in compliance with which the required temperature is set in the room, the heat source is connected, and simultaneously non-heated coolant-air is supplied for heating, and air temperature is monitored in the heated room. At the same time the water heating boiler is changed over to a working mode, and a circulation pump is started in the water heat exchanger circuit, simultaneously with this the coolant air is supplied into the system, air flow is increased, as well as heat amount removed from the water heat exchanger. Also a system of air heating is described.
EFFECT: reduction of noise with lower costs for the system realisation, faster heating of premises.
5 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
AIR HEATING SYSTEM | 2001 |
|
RU2230259C2 |
METHOD OF SELF-CONTAINED AIR HEATING AND HOT-WATER SUPPLY OF DWELLING HOUSE AND AIR HEATING SYSTEM FOR IMPLEMENTING PROPOSED METHOD | 2006 |
|
RU2320929C2 |
BUILDING AIR HEATING SYSTEM | 2018 |
|
RU2702635C1 |
DEVICE FOR HOT-AIR HEATING AND VENTILATION | 0 |
|
SU605060A1 |
AIR HEATING AND VENTILATION SYSTEM | 0 |
|
SU1295156A1 |
SYSTEM FOR AIR HEATING AND VENTILATION | 2006 |
|
RU2293255C1 |
BUILDING HEATING AND VENTILATION METHOD | 2011 |
|
RU2458287C1 |
METHOD FOR SUPPLYING INTAKE AIR COMBINED WITH AIR HEATING OF BUILDINGS | 2021 |
|
RU2766242C1 |
METHOD FOR HEATING SUPPLY VENTILATION AIR | 2020 |
|
RU2753094C1 |
BUILDING HEATING AND CONDITIONING METHOD AND DEVICE | 2019 |
|
RU2725127C1 |
Authors
Dates
2012-01-10—Published
2010-04-08—Filed