FIELD: oil and gas production.
SUBSTANCE: method of formation bottom-hole zone acid treatment includes two pumping cycles of 10-15% water solution of hydrochloric acid with the use of displacement fluid each containing pulse solution pumping at 1-4 MPa, pumping of this solution at constant pressure, technological exposure for 2.5-3.5 hours for reaction and reaction products removal with further bottom-hole cleaning by flushing fluid. Solution pulse pumping is carried out for 5 minutes with 6-10 minutes breaks. Pumping at constant pressure is done by portions of 2-4 m3 with holding 2-4 hours between portions. Pumping of solution portions is stopped at pumping pressure exceeding 3 MPa. Between solution pumping cycles there pumped is oil-acid composition containing 24-26% solution of hydrochloric acid in oil with volume of 1-4 m3 at 7 MPa. Oil is used as displacement and flushing fluid.
EFFECT: increase of well bottom-hole zone treatment efficiency and increase of well productivity due to increase of acid treatment covering of entered formation.
3 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF ACID TREATMENT OF BOTTOM-HOLE FORMATION ZONE WITH CARBONATE RESERVOIR | 2011 |
|
RU2451160C1 |
TREATMENT METHOD OF BOTTOMHOLE ZONE | 2012 |
|
RU2512216C1 |
METHOD OF ACIDIZING BOTTOMHOLE FORMATION ZONE WITH CARBONATE RESERVOIR | 2017 |
|
RU2652412C1 |
METHOD FOR COMPLETING AND INTENSIFYING INFLOW OF WELL WITH CARBONATE RESERVOIRS | 2020 |
|
RU2750004C1 |
METHOD FOR WELL BOTTOM ZONE TREATMENT | 2006 |
|
RU2312211C1 |
ACID TREATMENT METHOD FOR BOTTOMHOLE ZONE OF FORMATION HAVING CARBONATE RESERVOIR | 2006 |
|
RU2312210C1 |
METHOD OF TREATMENT OF WELL BOTTOMHOLE ZONE WITH LOW BED PRESSURE | 2013 |
|
RU2537433C1 |
TREATMENT METHOD OF BOTTOMHOLE ZONE | 2012 |
|
RU2520221C1 |
METHOD OF FORMATION TREATMENT | 2012 |
|
RU2506420C1 |
DEVELOPMENT METHOD OF BOTTOM-HOLE ZONE | 2012 |
|
RU2506421C1 |
Authors
Dates
2012-05-20—Published
2011-04-29—Filed