FIELD: blasting.
SUBSTANCE: method includes installation of explosive charges under ice and their by-turn blasting with a time interval equal to the time of flexure-gravity wave travelling from an area of blasting of the previous charge to an area of blasting of the next charge. Explosive charges are installed above an ice cover and blasted simultaneously with blasting of charges installed under the ice cover. Prior to installation of explosive charges wind speed and direction, underwater currents and ice field drifts are measured, ice thickness is identified. Explosive charges are installed to generate a direction of impact wave propagation to opposite sides from an area of location of a marine facility of business operations.
EFFECT: higher reliability of protection of a marine facility of business operations against exposure of ice formations.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
DRILL TARGET DAMAGE PROTECTION DEVICE FOR MOVEMENT OF ICE FLOES | 2012 |
|
RU2493322C1 |
METHOD OF ICE COVER DESTRUCTION AND DEVICE FOR ICE COVER DESTRUCTION | 2014 |
|
RU2552753C1 |
SYSTEM FOR ILLUMINATING ICE CONDITIONS AND PREVENTING EFFECT OF ICE FORMATIONS ON SEA OBJECTS OF BUSINESS OPERATIONS | 2014 |
|
RU2583234C1 |
WHEEL-TYPE POWERHELM UNIT OF ARTIC VOYAGE SHIP | 2011 |
|
RU2456201C1 |
METHOD OF DETERMINING SEA ICE DRAFT AND SYSTEM TO THIS END | 2010 |
|
RU2453865C1 |
METHOD OF ACTIVE STRUGGLE WITH ICEBERG DANGER AND DEVICE TO THIS END | 2012 |
|
RU2484209C1 |
METHOD FOR REMOVING LOWER SURFACE OF ICE COVER | 2010 |
|
RU2444760C1 |
METHOD TO ACTIVELY FIGHT ICEBERG HAZARD AND DEVICE FOR ITS REALISATION | 2011 |
|
RU2467121C1 |
METHOD OF SUNK SHIP SURFACING AND COMPLEX FOR SURFACING AND FLOATING SUNK SUBMARINES AND OTHER VESSELS | 2012 |
|
RU2479460C1 |
METHOD FOR RECOVERY AND TRANSPORTATION OF GAS HYDRATES FROM BOTTOM SEDIMENTS AND SUBMARINE VESSEL FOR RECOVERY AND TRANSPORTATION OF GAS HYDRATES | 2014 |
|
RU2554374C1 |
Authors
Dates
2012-06-10—Published
2010-11-16—Filed