FIELD: construction.
SUBSTANCE: method consists in removal of water from a drop, giving the specified position to the drop bottom, laying of a water-impermeable geomembrane onto this bottom and covering of a geomembrane and a beach with a protective layer from natural soil. The geomembrane edge is installed above the rated water level in the pond, created in the drop with atmospheric precipitation and put into economic turnover. In plan beyond the geomembrane the protective layer in its base comprises an antifiltration layer coupled with a geomembrane.
EFFECT: reduced scope of planning works and dust generation, increased suitability of area of a preserved pond for further use in a direction previously not characteristic for it.
5 cl, 1 ex, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR RECLAMATION OF SLUDGE POND COMPARTMENT FILLED WITH GRAINY WASTES OF INDUSTRIAL ENTERPRISES | 2009 |
|
RU2396430C1 |
COMPARTMENT OF SLUDGE POND FOR INDUSTRIAL ENTERPRISES WASTES, METHOD OF ITS DEVELOPMENT AND METHOD OF ITS PRESERVATION | 2009 |
|
RU2385987C1 |
RECULTIVATION METHOD OF COMPARTMENT OF INWASH STORAGE UNIT, WHICH IS FILLED WITH WASTES | 2009 |
|
RU2409743C1 |
COMPARTMENT OF SLUDGE POND OF INDUSTRIAL ENTERPRISES WASTES | 2009 |
|
RU2385988C1 |
METHOD FOR INCREASING RELIABILITY OF LIQUID INDUSTRIAL WASTE STORAGE UNIT | 2010 |
|
RU2442857C1 |
METHOD FOR RECULTIVATION OF INWASH TAILINGS POND ADJACENT TO SLOPE | 2009 |
|
RU2403389C1 |
WASHED IN COLLECTOR OF WASTES ADJACENT TO SLOPE, METHOD FOR ITS MANUFACTURING AND METHOD OF ITS RECLAMATION | 2009 |
|
RU2398066C1 |
WATER ENGINEERING SYSTEM ON PERMAFROST SOILS | 2010 |
|
RU2416692C1 |
METHOD FOR STOCKING OF GRANULAR WASTE IN SLUDGE POND SECTION AND INTO BODY OF CONSERVATION OVER SECTION | 2009 |
|
RU2382847C1 |
FLOOD-PLAIN SLUDGE POND FOR INDUSTRIAL WASTE | 2004 |
|
RU2275457C2 |
Authors
Dates
2012-06-10—Published
2011-02-11—Filed