FIELD: oil and gas industry.
SUBSTANCE: in method for balancing of injection well water-intake capacity profile and restriction of water influx to production wells, which involves pumping to the formation of gel-forming composition containing, wt %: sodium silicate 1-10, chrome acetate 0.5-2, water is the rest, pumping of the above composition to formation, technological pause, prior to pumping of the above composition to wells there pumped is fresh water; induction period of gel-forming composition at formation temperature is set so that it is equal to 6-10 hours, and technological pause is chosen so that its duration is equal to 24-36 hours.
EFFECT: improving the efficiency of oil displacement from formation due to water isolation of highly water-flooded formations in production wells either due to equalising the water-intake capacity profile of injection wells by partial or complete blocking of highly washed channels or interlayers for movement of injection water.
1 ex, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF LEVELING INJECTIVITY PROFILE OF INJECTION WELLS AND LIMITING WATER INFLOW TO PRODUCTION WELLS | 2016 |
|
RU2661973C2 |
METHOD FOR LIMITATION OF WATER INFLOW TO WELLS AT THICK OIL DEPOSITS | 2016 |
|
RU2632799C1 |
PROCEDURE FOR SELECTIVE SHUTOFF OF WATER-ENCROACHED SECTIONS OF OIL RESERVOIR | 2013 |
|
RU2536529C1 |
METHOD FOR SHUT OFF OF WATERED INTERVALS OF PRODUCTIVE FORMATIONS IN HORIZONTAL WELLS AT FIELDS WITH LOW-PERMEABLE RESERVOIRS | 2016 |
|
RU2665494C2 |
COMPOSITION FOR LIMITING WATER INFLUX INTO WELL | 2018 |
|
RU2704661C1 |
COMPOSITION FOR ISOLATING WATER INFLUX INTO WELL | 2017 |
|
RU2669648C1 |
METHOD FOR BALANCING INJECTION WELL WATER-INTAKE CAPACITY PROFILE AND RESTRICTION OF WATER INFLUX TO PRODUCTION WELLS | 2015 |
|
RU2597593C1 |
METHOD FOR INJECTION WELL INFECTIVITY PROFILE ALIGNING AND WATER IN-FLOW LIMITATION FOR PRODUCTION WELL (VERSIONS) | 2009 |
|
RU2382185C1 |
INJECTIVITY PROFILE CONTROL METHOD FOR INJECTION WELL AND WATER INFLUX RESTRICTION METHOD FOR PRODUCING WELL | 2005 |
|
RU2285785C1 |
METHOD OF CONTROLLING PROFILE LOG OF INJECTION WELL AND RESTRICTING WATER INFLUX IN PRODUCTION WELL | 2007 |
|
RU2347897C1 |
Authors
Dates
2012-07-20—Published
2011-01-11—Filed