FIELD: oil-and-gas industry.
SUBSTANCE: invention relates to oil industry and may be used in construction of inclined and horizontal wells. Proposed method comprises bottomhole flushing, injecting cementing solution, squeezing said solution and square rod reciprocation. In compliance with this invention, flushing with flushing solution is stopped, mud solution is injected, process is held to equalise pressure in the well and settle mud particles. Thereafter, flushing is resumed. In injecting cementing solution unless its outflow from drill pipes, drill string is revolved. To ensure laminar flow of cementing solution in hole annuity cementing solution is squeezed down at low rate while reciprocation of square rod is performed with amplitude of 1-3 metres.
EFFECT: stable lining.
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR WELL CONSTRUCTION | 2012 |
|
RU2494214C1 |
WELL COMPLETION METHOD | 2018 |
|
RU2723815C1 |
CONSTRUCTION OF OIL PRODUCTION WELL | 2013 |
|
RU2524089C1 |
WELL CONSTRUCTION METHOD | 2011 |
|
RU2439274C1 |
METHOD FOR CEMENTING OIL AND GAS WELLS AND DEVICE FOR REALIZATION OF SAID METHOD | 2005 |
|
RU2291948C1 |
CONSTRUCTION METHOD OF WELL OF SMALL DIAMETRE | 2010 |
|
RU2407879C1 |
METHOD OF CONSTRUCTING A SIDE WELL SHAFT | 2020 |
|
RU2728178C1 |
METHOD AND DEVICE FOR LOWERING AND CEMENTING CASING STRINGS | 2021 |
|
RU2765934C1 |
WELL CONSTRUCTION METHOD | 2012 |
|
RU2474667C1 |
METHOD OF WELL CONSTRUCTION IN COMPLICATED MINING AND GEOLOGICAL CONDITIONS FOR DRILLING AND DEVICE FOR ITS IMPLEMENTATION | 2013 |
|
RU2531409C1 |
Authors
Dates
2012-11-20—Published
2011-05-03—Filed