FIELD: machine building.
SUBSTANCE: connection coupling with a sealing element is installed in place of a joint of connected pipes, afterwards pressing is carried out. Pressing is carried out by blasting of circular charges installed on the outer surface of the coupling. The number of pressings is at least two on each connection of the coupling with the pipe.
EFFECT: invention improves reliability of a joint.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
GASSY AND NON-GASSY LIQUID PRODUCTION PLANT | 2012 |
|
RU2489599C1 |
PROCEDURE FOR EXTRACTION OF RESERVOIR GAS CUT AND DEGASSED FLUID | 2012 |
|
RU2495281C1 |
METHOD FOR BREAKING DOWN UNSTABLE MOUNTAIN MASS | 1992 |
|
RU2047761C1 |
BOREHOLE PNEUMATIC DISPLACEMENT PUMP | 2010 |
|
RU2427729C1 |
DEEP-WELL AIR-OPERATED DISPLACEMENT PUMP | 2009 |
|
RU2403458C1 |
PROCEDURE FOR EXTRACTION OF RESERVOIR GASSY FLUID | 2010 |
|
RU2427728C1 |
APPARATUS FOR EXPLOSION OF FORMING REINFORCING MEMBERS | 1997 |
|
RU2111074C1 |
GASIFIED LIQUID EXTRACTION PLANT | 2010 |
|
RU2421636C1 |
PROCEDURE FOR EXTRACTION OF RESERVOIR DEGASSED FLUID | 2010 |
|
RU2424448C1 |
STILL LIQUID EXTRACTION PLANT | 2010 |
|
RU2421635C1 |
Authors
Dates
2012-11-27—Published
2010-10-04—Filed