FIELD: mining.
SUBSTANCE: multi-bucket overburden unit comprises a bottomhole and a dump carriage non-rotary platforms with masts that correspond to them, connected with a system of ropes, and a bucket. It is additionally equipped with at least one mast of the bottomhole carriage non-rotary platform and at least one mast of the dump carriage non-rotary platform connected by a system of ropes with a bucket, at the same time additional masts are installed on bottomhole and drum carriage non-rotary platforms along a straight line, and each subsequent additionally installed mast of bottomhole and dump carriage non-rotary platforms is arranged with height that is less than the previous one in direction of inclination of a filled split slope of the inner dump by a value determined with the following mathematical expression: H=Sxtgα, where H - difference of heights of two nearby arranged masts, m; S - distance between masts, m; α - angle of internal dump slope, degrees. Bottomhole and dump carriage non-rotary platforms are arranged as capable of changing their length by means of connection and disconnection of sections.
EFFECT: higher efficiency, reduced power and materials consumption.
2 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
STRIPPING AGGREGATE | 2009 |
|
RU2396394C1 |
EXCAVATION-TRANSPORTATION SYSTEM | 2011 |
|
RU2456454C1 |
UNIT FOR TRANSPORTLESS OPENCAST MINING | 1992 |
|
RU2034114C1 |
METHOD FOR DIRECT DEVELOPMENT OF WORKING TRENCH | 2012 |
|
RU2520234C1 |
METHOD OF WORKING TRENCH DIRECT DRIVING | 2015 |
|
RU2602246C1 |
METHOD FOR FORMATION OF EXTERNAL DUMP OVERBURDEN DURING TRENCHING | 2018 |
|
RU2700855C1 |
METHOD FOR DUMPING OVERBURDEN ROCKS INTO OUTER DUMP WITH NON-TRANSPORT SINKING OF INITIAL CUT | 2018 |
|
RU2672294C1 |
DIRECT MINING METHOD | 2013 |
|
RU2537309C1 |
METHOD OF CONSTRUCTING FENCING DAMS OF TALL PONDS IN INTERNAL DUMPS OF HORIZONTAL DEPOSITS | 0 |
|
SU1260521A1 |
METHOD OF SHAPING DUMPS | 0 |
|
SU1273558A1 |
Authors
Dates
2012-12-27—Published
2011-07-26—Filed