FIELD: mining.
SUBSTANCE: multi-bucket overburden unit comprises a bottomhole and a dump carriage non-rotary platforms with masts that correspond to them, connected with a system of ropes, and a bucket. It is additionally equipped with at least one mast of the bottomhole carriage non-rotary platform and at least one mast of the dump carriage non-rotary platform connected by a system of ropes with a bucket, at the same time additional masts are installed on bottomhole and drum carriage non-rotary platforms along a straight line, and each subsequent additionally installed mast of bottomhole and dump carriage non-rotary platforms is arranged with height that is less than the previous one in direction of inclination of a filled split slope of the inner dump by a value determined with the following mathematical expression: H=Sxtgα, where H - difference of heights of two nearby arranged masts, m; S - distance between masts, m; α - angle of internal dump slope, degrees. Bottomhole and dump carriage non-rotary platforms are arranged as capable of changing their length by means of connection and disconnection of sections.
EFFECT: higher efficiency, reduced power and materials consumption.
2 cl, 5 dwg
| Title | Year | Author | Number | 
|---|---|---|---|
| STRIPPING AGGREGATE | 2009 | 
 | RU2396394C1 | 
| EXCAVATION-TRANSPORTATION SYSTEM | 2011 | 
 | RU2456454C1 | 
| UNIT FOR TRANSPORTLESS OPENCAST MINING | 1992 | 
 | RU2034114C1 | 
| METHOD FOR DIRECT DEVELOPMENT OF WORKING TRENCH | 2012 | 
 | RU2520234C1 | 
| METHOD OF WORKING TRENCH DIRECT DRIVING | 2015 | 
 | RU2602246C1 | 
| METHOD FOR FORMATION OF EXTERNAL DUMP OVERBURDEN DURING TRENCHING | 2018 | 
 | RU2700855C1 | 
| METHOD FOR DUMPING OVERBURDEN ROCKS INTO OUTER DUMP WITH NON-TRANSPORT SINKING OF INITIAL CUT | 2018 | 
 | RU2672294C1 | 
| DIRECT MINING METHOD | 2013 | 
 | RU2537309C1 | 
| REMOVAL OF ROCK BY LIGHT VEHICLES OF INCREASED CARRYING CAPACITY AND FAN SPREADING THEREOF TO DUMPS FROM OPEN-PIT ROADS BY MEANS OF SPREADERS | 2022 | 
 | RU2833025C2 | 
| METHOD OF CONSTRUCTING FENCING DAMS OF TALL PONDS IN INTERNAL DUMPS OF HORIZONTAL DEPOSITS | 0 | 
 | SU1260521A1 | 
Authors
Dates
2012-12-27—Published
2011-07-26—Filed