FIELD: oil and gas industry.
SUBSTANCE: according to the method of development of bottom-hole zone of terrigenous oil formation, before pumping of acid solution well is killed by solution of alkali metal hydroxide adding potassium and/or natrium chloride in quantity 0-35 wt % to obtain optimum density of composition, then well is pumped with aqueous solution containing 4-8 wt % of chlorhydric acid and 0.5-1.5 wt % of fluorhydric acid adding versene (trilon "B") in quantity 0.01-0.5 wt %, sodium dodecylsulfate in quantity 0.01-0.1 wt %, then aqueous solution of oil wetting agent NG-1 with concentration 0.01-2 wt % is pumped into formation.
EFFECT: improving efficiency of development of bottom-hole formation zone due to prevention of sedimentation of reaction products of solution chlorhydric and fluorhydric acid with rock of bottom-hole formation zone, reducing water content of well products due to modification of reservoir rock wetting, hardening of porous medium due to use of hydrophobisated reagents.
1 tbl
Title | Year | Author | Number |
---|---|---|---|
COMPOSITION FOR ACID TREATMENT OF BOTTOM-HOLE TERRIGENOUS FORMATION ZONE | 2016 |
|
RU2614994C1 |
TREATMENT METHOD OF BOTTOMHOLE FORMATION ZONE WITH TERRIGENOUS TYPE OF RESERVOIR | 2019 |
|
RU2724833C1 |
METHOD OF MULTI-STAGE TREATMENT OF INJECTION WELL BOTTOMHOLE ZONE IN TERRIGENOUS AND CARBONATE FORMATIONS | 2017 |
|
RU2642738C1 |
METHOD OF PROCESSING FORMATION BOTTOMHOLE ZONE | 2007 |
|
RU2352773C1 |
METHOD OF TREATING BOTTOM ZONE OF OIL FORMATION | 1998 |
|
RU2140531C1 |
METHOD FOR TREATING BOTTOM-HOLE ZONE OF OIL BED | 1997 |
|
RU2124123C1 |
ACID SURFACE-ACTIVE COMPOSITION FOR TREATING BOTTOM-HOLE ZONE OF OIL AND GAS WELLS | 2015 |
|
RU2643050C2 |
METHOD FOR PROCESSING THE BOTTOM-HOLE ZONE OF A PRODUCTIVE LAYER SATURATED WITH HYDROCARBONS WITH RESIDUAL HIGHLY MINERALISED PORE WATER | 2020 |
|
RU2757456C1 |
ACID COMPOSITION FOR TREATMENT OF TERRIGENOUS RESERVOIR BOTTOMHOLE FORMATION ZONE WITH HIGH CARBONATENESS | 2016 |
|
RU2616923C1 |
METHOD OF ACIDISING OF HOLEBOTTOM AREA TREATMENT OF TERRIGENOUS COLLECTOR | 2008 |
|
RU2386803C1 |
Authors
Dates
2013-02-20—Published
2011-08-12—Filed