FIELD: mining.
SUBSTANCE: method of tunnel building includes the following operations: soil development and its transportation, support of mine workings at driving with shotcrete, probably with anchors, arcs and net, geophysical measurement of rock density in bottom-hole zone, which results are used for correction of length of planned driving and thickness of layer of shotcrete in order to speed-up driving and to reduce shotcrete flow rate.
EFFECT: accident prevention, possibility of correction of driving method in order to speed-up it and correction of structure of temporary support in order to improve its efficiency, improving safety of underground operations.
2 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF CONSTRUCTING A SHALLOW-DEPTH TUNNEL | 0 |
|
SU1234642A1 |
METHOD FOR PERFORATING A FOREHEAD OF A TUNNEL BOTTOM | 2019 |
|
RU2723422C1 |
TUNNEL LINING | 0 |
|
SU1191590A1 |
METHOD OF CONSOLIDATING MINE WORKING WITH MONOLITHIC CONCRETE | 0 |
|
SU943401A1 |
METHOD FOR SUPPORTING MINE WORKINGS WITH THERMAL STRENGTHENING OF UNSTABLE ROCKS | 2009 |
|
RU2405938C1 |
METHOD FOR CONSTRUCTION OF PREFABRICATED-SOLID SUPPORT OF SHAFT OF MINING ENTERPRISE AND DEVICE FOR ITS IMPLEMENTATION | 2016 |
|
RU2631061C1 |
METHOD OF BARING AND SECURING CHAMBER-TYPE WORKINGS | 0 |
|
SU1049666A1 |
METHOD FOR REINFORCEMENT OF MINES SOIL | 2011 |
|
RU2468207C1 |
METHOD OF SUPPORTING UNDERGROUND STRUCTURE | 0 |
|
SU1511409A1 |
TUNNELLING COMPLEX | 0 |
|
SU1817815A3 |
Authors
Dates
2013-02-20—Published
2011-07-19—Filed