FIELD: oil and gas industry.
SUBSTANCE: method for formation bottom-hole area treatment includes mounting of oil-well tubing in the well below perforation holes, determination of technical condition of production string and character of production formation saturation in perforation zone on the base of geological-geophysical researches data, pumping and squeezing down to the formation water solution of alkali metal supersalt with holding for reaction for 10-12 h, extraction of reaction products from bottom-hole area by well blowing by inert gas or gas from well-donor through casing annulus, pumping and squeezing down to the formation hydrogen chloride, holding for reaction for 6-8 h, well development by gas from well-donor or inert gas.
EFFECT: increase of efficiency of formation bottom-hole area treatment at stimulation of hydrocarbons influx to the well.
1 tbl
Title | Year | Author | Number |
---|---|---|---|
TREATMENT METHOD OF BOTTOM-HOLE ZONE OF HORIZONTAL OR INCLINED WELL | 2011 |
|
RU2471978C1 |
PROCEDURE FOR TREATMENT OF BOTTOMHOLE ZONE OF TERRIGENOUS RESERVOIR | 2009 |
|
RU2417309C1 |
PROCESSING OF BOTTOMHOLE OF LOW-CEMENTED TERRIGENOUS BED AT ABNORMALLY LOW BED PRESSURE | 2013 |
|
RU2528803C1 |
METHOD OF FILTER CAKE REMOVAL OF BOTTOM HOLE AREA OF LOW-PERMEABLE LOW-TEMPERATURE TERRIGENOUS RESERVOIR | 2014 |
|
RU2555173C1 |
METHOD FOR BOTTOM-HOLE ZONE TREATMENT | 2011 |
|
RU2460872C1 |
BOTTOM WATER ISOLATION METHOD | 2013 |
|
RU2569941C2 |
METHOD OF BOTTOM-HOLE FORMATION ZONE STABILISING | 2013 |
|
RU2532935C1 |
METHOD OF BOTTOM-HOLE ZONE TREATMENT OF LOW-PERMEABLE TERRIGENOUS FORMATIONS (VERSIONS) | 2010 |
|
RU2451175C1 |
METHOD OF WATER-PRODUCING WELL RECOVERY | 2014 |
|
RU2558837C1 |
PROCESSING OF HOLE-BOTTOM AREA OF CAVERNOUS FRACTURE TERRIGENOUS BED WITH NEAR GAS-WATER CONTACT | 2013 |
|
RU2531983C1 |
Authors
Dates
2013-03-20—Published
2011-09-19—Filed