FIELD: oil and gas industry.
SUBSTANCE: well is equipped bottom upwards with a tubing string ended with a packer, submerged pump, switch, two outer and inner annulus of the tubing string which are located concentrically, tubes with holes at the outer tubing string. The well is splitted over the productive stratum. The stratal product is delivered by the submerged pump in a cyclic mode "delivery-stop" from the productive stratum through the tubing string, the switch, tubular annulus between inner and outer tubing string, tubes and holes of tubes into tubular annulus between the production string and outer tubing string. Pressure is created and maintained in the upper pert of the well; it should not be less than oil degassing pressure and more than permissible pressure to the production string. Separation of the stratal product into oil and water is arranged in the upper part of the well. Completeness of separation is controlled by the duration of a half of the operation cycle of the submerged pump till stoppage and by the distance between switch and the tube with a hole. Oil is delivered to oil line. Water is supplied through the switch to inner tubing string and through the pipeline to an injection well by borehole-to-borehole water pumping and/or through tubular annulus between the production string and outer tubing string and tubing string with a packer to the stratum over the packer by borehole water pumping.
EFFECT: improvement of oil and water separation degree, increase in injection efficiency of separated water during borehole and borehole-to-borehole pumping of water.
1 ex, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
OIL DEPOSIT DEVELOPMENT METHOD | 2014 |
|
RU2540714C1 |
METHOD OF DEVELOPMENT OF OIL DEPOSITS | 2014 |
|
RU2547860C1 |
DEVELOPMENT METHOD OF MULTIPLE-ZONE OIL DEPOSIT | 2014 |
|
RU2540715C1 |
METHOD FOR OIL DEVELOPMENT WITH HORIZONTAL WELLS | 2014 |
|
RU2539486C1 |
METHOD OF DEVELOPMENT OF MULTIRESERVOIR OIL DEPOSITS | 2014 |
|
RU2547857C1 |
METHOD OF INJECTION OF WATER IN THE SYSTEM OF SUPPORTING THE RESERVOIR PRESSURE IN WEAKLY PERMEABLE HEADERS | 2018 |
|
RU2676780C1 |
METHOD FOR INTER-WELL TRANSIT OF LIQUID | 2005 |
|
RU2290500C1 |
WELL OPERATION INSTALLATION | 2013 |
|
RU2531228C1 |
UNIT FOR OPERATION OF WATER SUPPLY WELLS | 2013 |
|
RU2536521C1 |
METHOD TO DEVELOP MULTIZONE OIL RESERVOIR | 2011 |
|
RU2491418C1 |
Authors
Dates
2013-08-20—Published
2012-10-04—Filed