METHOD TO INVESTIGATE BEDS IN PROCESS OF OIL AND GAS WELLS DRILLING AND SAMPLER FOR ITS REALISATION Russian patent published in 2013 - IPC E21B49/08 

Abstract RU 2492323 C1

FIELD: oil and gas industry.

SUBSTANCE: in process of sampling, values of specific electric conductivity are measured on liquid arriving into a sampling chamber. At the same time measured values of specific electric conductivity and readings of pressure and temperature sensors are recorded with a surface receiving-processing station, and to form a channel of communication with it and to provide for sampler lowering and lifting, an armoured geophysical cable is used, which is withdrawn from a drilling string via a sealing device. Besides, before opening of a potentially producing bed, the sampler at the vibration and impact safe distance from a bit is fixed on the cable in the above-packer space of the above-bit packering unit, providing for direct circulation of the mud. And after opening the sampling operation is carried out by means of multiple sampling and remote express-analysis of fluid composition in every sample according to specific electric conductivity, for this purpose the chamber by means of piston displacement is released from the first sample with fluid discharge into the above-packer space. Then it is put into the initial working condition, and similarly to the first sample taking, further sampling is carried out, until extremum of specific electric conductivity values is achieved, and on the basis of this parameter, a decision is made to lift the last sample from the well or to continue drilling process, and bed parameters are identified on the basis of pressure, temperature sensor readings, and by the value and speed of increments of specific electric conductivity.

EFFECT: increased efficiency of sampling of oil reservoirs opened with drilling, also in abnormal boreholes.

8 cl, 6 dwg

Similar patents RU2492323C1

Title Year Author Number
SETUP FOR DRILLING BORE-HOLES 1996
  • Bergshtejn O.Ju.
  • Vorozhbitov M.I.
  • Indrupskij D.I.
  • Ivanov E.A.
  • Timonichev O.N.
RU2107816C1
FORMATION TESTER OPERABLE WHILE DRILLING 0
  • Nagumanov Mirsat Mirsalimovich
SU696151A1
METHOD AND DEVICE FOR CONTROL OVER QUALITY OF FLUID PUMPING-OUT BY MEANS OF ANALYSIS OF RATE OF FLUID INFLOW FROM ROCK 2004
  • Shammaj Majkl
  • Li Tszaedon
RU2349751C2
FORMATION TESTER 1994
  • Afinogenov Jurij Alekseevich
  • Belen'Kov Anatolij Fedorovich
RU2082001C1
METHOD AND DEVICE FOR DETERMINATION OF OPTIMAL RATE OF FLUID WITHDRAWAL ON BASE OF PRESSURE DETERMINED IN WELL AT BEGINNING OF CONDENSATION 2004
  • Shammaj Khouman M.
RU2352776C2
WELL-TESTING DEVICE 0
  • Klimenko Yurij Aleksandrovich
  • Lugovskoj Stanislav Nikolaevich
  • Tokarev Viktor Petrovich
  • Lastovka Viktor Grigorevich
  • Dudkin Dmitrij Davydovich
SU1645488A1
SAMPLE-TAKING DREDGER 0
  • Tanov Evgenij Ivanovich
  • Grabenko Viktor Ivanovich
  • Ismailov Robert Azizovich
SU857461A1
SETUP FOR DRILLING HOLE 1993
  • Bergshtejn O.Ju.
  • Vorozhbitov M.I.
  • Ivanov E.A.
  • Indrupskij D.I.
  • Timonichev O.N.
RU2085692C1
DIRECTED SAMPLING OF FORMATION FLUIDS 2010
  • Pop Dzhulian Dzh.
  • Korr P'Er-Iv
RU2556583C2
WATER LOSS CONTROL METHOD FOR CIRCULATING FLUID 2014
  • Malyuga Anatolij Georgievich
  • Sherstnev Sergei Nikolaevich
RU2566160C1

RU 2 492 323 C1

Authors

Malyuga Anatolij Georgievich

Dates

2013-09-10Published

2012-04-09Filed