DEVELOPMENT METHOD OF OIL DEPOSITS USING FORMATION HYDRAULIC FRACTURING Russian patent published in 2013 - IPC E21B43/20 

Abstract RU 2496976 C1

FIELD: oil and gas industry.

SUBSTANCE: method involves construction of injection and production wells, carrying-out of directional hydraulic fracturings so that hydraulic connection is provided, pumping of displacement agent to injection wells so that uniform front of high pressure is provided in rows of injection wells, and takeoff of fluid from production wells. With that, directional hydraulic fracturings are performed only in rows of injection wells. In production wells there made is an analysis of the product flooding rate, as per which flooding maps are built and configuration of front of oil displacement with water is determined. Besides, in different injection wells arranged in rows there changed are volumes of pumped displacement agent to provide uniform high-pressure front.

EFFECT: possible in-line control by moving the front for oil displacement with water; excluding the risk of premature flooding of production wells with pumped-in water.

3 cl

Similar patents RU2496976C1

Title Year Author Number
DEVELOPMENT METHOD OF OIL-GAS DEPOSIT USING HYDRAULIC FRACTURING OF FORMATION 2012
  • Ibatullin Ravil' Rustamovich
  • Nasybullin Arslan Valer'Evich
  • Salimov Vjacheslav Gajnanovich
  • Salimov Oleg Vjacheslavovich
RU2496001C1
METHOD OF OPERATION OF PRODUCTION AND WATER-BEARING FORMATIONS SEPARATED BY IMPERMEABLE INTERLAYER, WELL WITH HORIZONTAL SHAFTS AND CRACKS OF FORMATION HYDRAULIC FRACTURING 2016
  • Salimov Oleg Vyacheslavovich
  • Ziyatdinov Radik Zyauzyatovich
  • Girfanov Ildar Ilyasovich
RU2630514C1
METHOD FOR DEVELOPMENT OF OIL DEPOSITS BY HYDRAULIC FRACTURING FRACTURES 2016
  • Nasybullin Arslan Valerevich
  • Salimov Oleg Vyacheslavovich
  • Ziyatdinov Radik Zyauzyatovich
RU2618542C1
METHOD OF OIL POOL DEVELOPMENT WITH HYDRAULIC FRACTURING 2013
  • Khisamov Rais Salikhovich
  • Akhmetgareev Vadim Valer'Evich
  • Taipova Venera Asgatovna
RU2528308C1
METHOD FOR DEVELOPMENT OF MULTI-LAYER OIL DEPOSIT WITH APPLICATION OF HYDRAULIC FRACTURING OF FORMATION 2019
  • Salimov Oleg Vyacheslavovich
  • Antonov Maksim Sergeevich
  • Volkov Maksim Grigorevich
RU2726694C1
DEVELOPMENT METHOD OF MASSIVE OIL DEPOSIT USING HYDRAULIC FRACTURING OF FORMATION 2014
  • Ibatullin Ravil' Rustamovich
  • Nasybullin Arslan Valer'Evich
  • Salimov Oleg Vjacheslavovich
  • Salimov Vjacheslav Gajnanovich
  • Zijatdinov Radik Zjauzjatovich
RU2560022C1
DEVELOPMENT METHOD OF HIGH-VISCOSITY OIL OR BITUMEN DEPOSIT WITH APPLICATION OF HYDRAULIC FRACTURING 2016
  • Nasybullin Arslan Valerevich
  • Salimov Oleg Vyacheslavovich
  • Ziyatdinov Radik Zyauzyatovich
RU2633887C1
DEVELOPMENT METHOD OF MULTILAYER OIL DEPOSIT USING HYDRAULIC FRACTURING OF FORMATION 2012
  • Nasybullin Arslan Valer'Evich
  • Salimov Vjacheslav Gajnanovich
  • Salimov Oleg Vjacheslavovich
RU2513791C1
DEVELOPMENT OF LOW-PERMEABILITY OIL POOLS BY HORIZONTAL WELLS WITH MAINTENANCE OF SEAM PRESSURE 2013
  • Khisamov Rais Salikhovich
  • Akhmetgareev Vadim Valer'Evich
  • Khannanov Rustehm Gusmanovich
RU2526430C1
PROCEDURE FOR DEVELOPMENT OF OIL DEPOSITS 2010
  • Denisov Sergej Borisovich
  • Zhdanov Stanislav Anatol'Evich
  • Evdokimov Ivan Vladislavovich
  • Timchenko Evgenij Romanovich
  • Tokareva Dina Sergeevna
RU2432459C1

RU 2 496 976 C1

Authors

Ibatullin Ravil' Rustamovich

Nasybullin Arslan Valer'Evich

Antonov Oleg Gennad'Evich

Salimov Vjacheslav Gajnanovich

Salimov Oleg Vjacheslavovich

Dates

2013-10-27Published

2012-05-03Filed