FIELD: construction.
SUBSTANCE: dome roof is formed by coupling two conical surfaces with different angles of inclination of generatrices to a horizontal plane, comprises upper and lower meridional rectilinear ribs, which rest against a lower, upper and intermediate support rings. Circular runs that girdle the dome adjoin the meridional ribs. In points of coupling of lower meridional ribs with an intermediate support ring they install V-shaped braces. A system of cross links is installed in two adjacent sectors of the dome.
EFFECT: reduced material intensity and labour intensiveness of dome manufacturing and assembly.
3 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
RIBBED DOME | 2005 |
|
RU2298618C1 |
DOME | 2016 |
|
RU2627800C1 |
RIBBED DOME MADE OF GLUED WOODEN ARCH TRUSSES | 2021 |
|
RU2755174C1 |
RIBBED DOME | 2023 |
|
RU2822255C1 |
DOME BUILDING AND METHOD FOR CONSTRUCTION OF DOME BUILDING | 2022 |
|
RU2787490C1 |
NETWORK DOME | 0 |
|
SU1035158A2 |
DOME | 2013 |
|
RU2546703C1 |
DOME ROOF | 0 |
|
SU1096351A1 |
PRESTRAINED DOME AND METHOD OF ERECTING SAME | 0 |
|
SU990992A1 |
LONG-SPAN BUILDING WITH DOME-SLAB-CABLE (DSC) COATING | 2019 |
|
RU2740506C1 |
Authors
Dates
2013-12-27—Published
2012-04-24—Filed