FIELD: oil and gas industry.
SUBSTANCE: in the method for treatment of bottom-hole formation zone space above and below the perforation interval is straddled, solvent for asphalt, resin and paraffin deposits (ARPD) is injected into the straddled space, acidic agent - aqueous solution of acid - and displacing fluid is injected with maximum flow rate at pressure not more than 5 MPa, the process is withhold so that components could react and well is developed by swabbing. A mix of solvents MIS-prom, ITPS-RS and process water are used as ARPD solvent with the component ration of (0.34-0.38):(0.03-0.05):(0.57-0.63), polyamide acid salts are used as acidic reagent and oil is displacing fluid.
EFFECT: increase of formation bottom-hole zone treatment efficiency.
3 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DYNAMIC MATRIX ACID TREATMENT OF CARBONATE FORMATION | 2020 |
|
RU2750806C1 |
METHOD FOR PERFORATING WELL AND PROCESSING BOTTOM-HOLE CARBONATE FORMATION ZONE | 2017 |
|
RU2667239C1 |
METHOD OF TREATMENT OF THE NEAR-WELLBORE ZONE | 2022 |
|
RU2797160C1 |
METHOD FOR PROCESSING BOTTOMHOLE ZONE OF FORMATION COMPOSED OF CARBONATE ROCKS WITH OIL RESOURCES COMPLICATED TO EXTRACT | 2005 |
|
RU2288358C2 |
METHOD OF REPAIRING WELL | 2015 |
|
RU2584440C1 |
METHOD OF PROCESS WELL TREATMENT | 2015 |
|
RU2600137C1 |
WELL BOTTOM ZONE TREATMENT PROCESS | 2006 |
|
RU2304710C1 |
METHOD OF WELL BOTTOM ZONE PROCESSING | 2013 |
|
RU2531771C1 |
METHOD OF INTERVAL-BY-INTERVAL TREATMENT OF PRODUCING FORMATION WITH OPEN HORIZONTAL BOREHOLE | 2014 |
|
RU2570179C1 |
METHOD FOR COMPLETING AND INTENSIFYING INFLOW OF WELL WITH CARBONATE RESERVOIRS | 2020 |
|
RU2750004C1 |
Authors
Dates
2014-04-20—Published
2013-04-23—Filed