FIELD: construction.
SUBSTANCE: road slab includes two parts, the support surface of each of which has an ascend in a transport vehicle movement direction; with that, connection of support surfaces to each other looks like a step, and height of the receiving side face of the slab is equal to height of its delivery side face.
EFFECT: reducing cost and construction periods of an automobile road; increasing its operating life.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
AUTOMOBILE ROAD WITH HARD COATING, AND ITS OPERATING METHOD | 2013 |
|
RU2521683C2 |
ANVIL FOR SUPPORT PILES OF MOTOR ROAD WITH SLAB COVERAGE | 2013 |
|
RU2515801C2 |
METHOD TO CONSTRUCT SAFE MOTOR ROAD COATED BY BOARDS | 2012 |
|
RU2515799C2 |
MOTOR ROAD WITH RIGID SLAB PAVING AND METHOD OF ITS OPERATION | 2011 |
|
RU2474639C2 |
METHOD TO BUILD HIGHWAY WITH RIGID COATING OF BOARDS AND BOARD FOR ITS REALISATION | 2012 |
|
RU2517077C2 |
ROAD SLAB | 2013 |
|
RU2522567C2 |
MOTOR ROAD WITH SLAB PAVING AND METHOD OF ITS OPERATION | 2011 |
|
RU2474638C2 |
AUTOMOBILE ROAD, AND ITS OPERATING METHOD | 2013 |
|
RU2520226C2 |
ACCIDENT-FREE HIGHWAY AND METHOD OF ITS USE | 2013 |
|
RU2521012C2 |
SAFE AUTOMOBILE ROAD AND ITS OPERATING METHOD | 2013 |
|
RU2520116C2 |
Authors
Dates
2014-06-20—Published
2013-04-24—Filed