FIELD: mining.
SUBSTANCE: method comprises the identification of operational field, mineral objects of extraction, inside them - operational blocks with standard, temporarily sub-standard and substandard and sub-standard mineral resources and separation of rocky ones, outstripping, current and realtime automated obtaining of express information, digging of uncovering "wells" or short trenches. The roboting automated extraction of a mineral from formations during their extraction using a mechanical method of separation of minerals and rocks of thin rocky interlayers, automated lifting of a mineral to the daylight area or its bypass to the receiving device arranged in an adit. At excavation of fields of upland type, a rock mass is left in a goaf after excavation of interlayers, the face area is temporarily kept using the automated and roboting ready-made fastening.
EFFECT: improvement of performance of development of non-rocky sheet deposits with medium and steep pitch.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MINING SOLID MINERAL DEPOSITS | 2000 |
|
RU2182664C2 |
DEVELOPMENT METHOD OF THIN STEEP FIELDS OF ROCK TYPE | 2009 |
|
RU2399763C1 |
METHOD OF DEVELOPMENT OF FIELDS OF BUILDING ROCKS OF ROCKY AND SEMI-ROCKY TYPES | 2013 |
|
RU2533398C1 |
METHOD TO DEVELOP DEPOSITS OF MINERALS OF HALF-ROCK AND SOIL TYPES | 2011 |
|
RU2478788C1 |
DEVELOPMENT METHOD OF DIAMOND-ORE DEPOSITS | 2013 |
|
RU2537310C1 |
METHOD FOR AUTOMATED COMPLEX DEVELOPMENT OF ORE AND NONMETALLIC DEPOSITS | 2013 |
|
RU2541008C1 |
METHOD FOR COMPLEX DEVELOPMENT OF STRUCTURALLY-MORPHOLOGICALLY DIFFICULT DEPOSIT | 2013 |
|
RU2514310C1 |
METHOD OF COMPREHENSIVE RELATED RESOURCES DEVELOPMENT DURING FIELDS DEVELOPMENT OF SOLID MINERAL RESOURCES | 2014 |
|
RU2561639C1 |
DEVELOPMENT METHOD OF ORE DEPOSITS OF NON HIGH-MELTING METALS | 2010 |
|
RU2425976C1 |
DEVELOPMENT METHOD OF MONOMETALLIC SULPHIDE ORE DEPOSITS | 2010 |
|
RU2434135C1 |
Authors
Dates
2014-11-20—Published
2013-08-20—Filed