FIELD: construction.
SUBSTANCE: engineering-geological and hydrogeological survey is carried out to detect available landslide bodies. Then biolocation survey is performed, using the results of which they detect underground watercourses and discover their characteristics for detection of quantity and location of through filters. Afterwards on the surface of a ledge or a slope or a hillside outside the landslide body a header is arranged for collection of surface waters and some shallow watercourses. Afterwards from the foot of the ledge or the slope or the hillside they arrange a drainage mine deep into the ledge or the slope or the hillside outside the landslide body, from the surface of the ledge or the slope or the hillside they drill vertical wells until coupling with the drainage mine for through filers, couplings are arranged with connection chambers, through filters are lowered into vertical wells from the surface, and through filters are made in the form of pipes with perforated sections of holes and filtering elements made at the coupling level with underground watercourses. The header and the drainage mine are arranged with an inclination of i=0.005 towards the drain for self-flow of captured water.
EFFECT: provision of reliable prevention of landslide formation due to complete drainage of surface and underground waters from a landslide body.
2 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CASCADE DEHYDRATION OF LANDSLIP BODY OF SLOPES OR WALLS | 2015 |
|
RU2590153C1 |
METHOD TO DEHYDRATE SLIDE BODIES BY SINGLE THROUGH FILTERS | 2012 |
|
RU2484249C1 |
TUNNEL DRIVING METHOD IN COMPLICATED MINE GEOLOGICAL AND HYDROGEOLOGICAL CONDITIONS | 2010 |
|
RU2436960C1 |
GROUND SLOPE OR HILLSIDE CONSOLIDATION METHOD | 2007 |
|
RU2345194C1 |
METHOD FOR PROTECTION AGAINST LANDSLIDE | 2003 |
|
RU2244063C1 |
METHOD FOR PREVENTION OF LANDSLIP FORMATION | 2011 |
|
RU2468146C1 |
MUDFLOW PROTECTIVE STRUCTURE | 2006 |
|
RU2317368C1 |
DRAINAGE-WATER WELL | 2007 |
|
RU2330916C1 |
AVALANCHE BRAKE STRUCTURE | 2010 |
|
RU2431715C1 |
METHOD OF SINGLE-FLOW STEPLESS TRANSPORTATION OF ROCK AND MINERAL DEPOSITS FROM MINE DURING ITS CONSTRUCTION AND OPERATION | 2011 |
|
RU2477373C1 |
Authors
Dates
2015-01-10—Published
2013-09-27—Filed