FIELD: oil and gas industry.
SUBSTANCE: while implementing the method a tubing string is run in to a well up to a bottomhole with a tube having a diameter more than the diameter of the tubing string with triangular windows and inner sharp tabs faced upwards under an angle of 25-30° to the vertical, circulation of the borehole fluid with a consumption rate within limits from 3.5 up to 8 l/s through the annular space, tube and tubing string through a holding tank in the volume not less than the well volume and lifting of the tubing string with the tube from the well.
EFFECT: raised efficiency of the well cleaning.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
WELL FLUID FILTRATION METHOD | 2015 |
|
RU2596840C1 |
METHOD FOR CLEANING A WELL FROM A COMPACTED SAND PLUG | 2021 |
|
RU2756220C1 |
METHOD FOR BOREHOLE BOTTOM FLUSHING | 2013 |
|
RU2527433C1 |
METHOD FOR BOREHOLE BOTTOM FLUSHING | 2011 |
|
RU2459925C1 |
METHOD OF REDUCING WELL REPAIR DURATION WITH INSTALLATION OF THE FLEXIBLE PIPE | 2017 |
|
RU2670795C9 |
METHOD OF CLEANING WELL FROM SAND PLUG AND JET GUN NOZZLE FOR ITS IMPLEMENTATION | 2019 |
|
RU2715003C1 |
METHOD FOR DEVELOPING WELL AFTER HYDRAULIC FRACTURING | 2016 |
|
RU2630930C1 |
METHOD FOR FLUSHING CLAY-SAND OR PROPPANT PLUG OUT OF A WELL | 2022 |
|
RU2796409C1 |
METHOD FOR BOTTOMHOLE ZONE TREATMENT | 2012 |
|
RU2512222C1 |
WELL REPAIR METHOD | 2014 |
|
RU2560453C1 |
Authors
Dates
2015-02-20—Published
2014-05-22—Filed