Abstract RU 2543005 C1

FIELD: oil and gas industry.

SUBSTANCE: according to the method in a watered part of a formation at first remedial cementing is made to cut the inflow of stratal water off and to isolate the watered part of the formation by a cement plug setting. A geophysical survey is performed in the non-watered part of the formation. Intervals are identified with bigger permeability of the productive formation areas. An assembly with an end-to-end channel is run in at the drill string and set by means of an anchor packer device. It is oriented towards one of the permeable areas of the productive formation. Mill equipment with a downhole drilling motor, flexible shaft and cutter is run in to the well at a flexible tube. An opening is cut in the production string wall with the use of an oil-based solution. The mill equipment is run out from the well. A jet nozzle is run in to the well up to a discharge outlet of the guide assembly. Cement stone and rock is washed out behind the production string so that a radial borehole is formed. The radial borehole treatment is made through the jet nozzle by an acid composition so that a cavern is formed. The flexible pipe with the jet nozzle is lifted out of the well. The guide assembly is rotated, for example, per 180 degrees and similar operations are performed to tunnel the next radial borehole. The guide assembly is lifted to the height of the next interval in the permeable areas of the productive formation and the similar operations are performed to tunnel the next radial boreholes. Up to the upper radial boreholes of the well an oil string is run in and the above string is made of tubing strings with the area of a clearance hole equal to the sum of all the clearance holes in the radial boreholes. The well is brought to operation.

EFFECT: improved efficiency of the method due to the removal of conditions for swelling of clays contained in the productive formation at tunnelling the radial borehole in low-permeable terrigenous deposits of water-swelling clays.

3 ex, 6 dwg

Similar patents RU2543005C1

Title Year Author Number
METHOD OF ACID LONGITUDINAL HYDRAULIC FRACTURING OF LOW-PERMEABLE TERRIGENOUS COLLECTOR 2014
  • Kustyshev Aleksandr Vasil'Evich
  • Panikarovskij Evgenij Valentinovich
  • Kustyshev Denis Aleksandrovich
  • Krasovskij Aleksandr Viktorovich
  • Nemkov Aleksej Vladimirovich
  • Antonov Maksim Dmitrievich
  • Isakova Ol'Ga Vladimirovna
RU2543004C1
METHOD OF WATER-PRODUCING WELL RECOVERY 2014
  • Skrylev Sergej Aleksandrovich
  • Kanashov Vladimir Petrovich
  • Kustyshev Aleksandr Vasil'Evich
  • Krjakvin Dmitrij Aleksandrovich
  • Kustyshev Denis Aleksandrovich
  • Saranchin Maksim Vladimirovich
  • Isakova Ol'Ga Vladimirovna
RU2558837C1
ISOLATION METHOD OF BRINE WATER INFLUX IN WELL 2014
  • Kustyshev Aleksandr Vasilevich
  • Panikarovskij Evgenij Valentinovich
  • Kustyshev Denis Aleksandrovich
  • Leontev Dmitrij Sergeevich
RU2580532C2
METHOD FOR ISOLATING INFLOW OF BOTTOM WATER IN OIL WELLS 2016
  • Leontev Dmitrij Sergeevich
  • Kleshchenko Ivan Ivanovich
  • Dolgushin Vladimir Alekseevich
  • Yagafarov Alik Kayumovich
  • Zhaparova Darya Vladimirovna
  • Zemlyanoj Aleksandr Andreevich
  • Sipina Natalya Alekseevna
RU2631512C1
METHOD FOR ISOLATION OF RESERVOIR WATER INFLOW IN WELL WITH BUCKLED FLOW STRING UNDER CONDITIONS OF ABNORMALLY LOW RESERVOIR PRESSURES 2009
  • Kustyshev Denis Aleksandrovich
  • Kustyshev Igor' Aleksandrovich
RU2405931C1
MARINE MULTIHOLE GAS WELL FOR OPERATION OF OFFSHORE DEPOSITS ARCTIC ZONE WITH SURFACE ARRANGEMENT OF WELLHEAD EQUIPMENT 2014
  • Krasovskij Aleksandr Viktorovich
  • Nemkov Aleksej Vladimirovich
  • Kustyshev Aleksandr Vasilevich
  • Kustyshev Igor Aleksandrovich
  • Antonov Maksim Dmitrievich
  • Petrov Sergej Aleksandrovich
RU2584706C1
METHOD FOR ISOLATION OF RESERVOIR WATER INFLOW IN WELL WITH BUCKLED FLOW STRING UNDER CONDITIONS OF ABNORMALLY LOW RESERVOIR PRESSURES 2009
  • Kustyshev Igor' Aleksandrovich
  • Kustyshev Denis Aleksandrovich
  • Vakorin Egor Viktorovich
  • Gubina Inga Aleksandrovna
RU2405930C1
METHOD OF INTENSIFICATION OF WELL OPERATION AFTER ITS CONSTRUCTION 2019
  • Ismagilov Fanzat Zavdatovich
  • Lutfullin Azat Abuzarovich
  • Khusainov Ruslan Fargatovich
RU2724705C1
METHOD OF OPERATION OF HYDROCARBONS RESERVOIR 2014
  • Krasovskij Aleksandr Viktorovich
  • Skrylev Sergej Aleksandrovich
  • Kustyshev Aleksandr Vasil'Evich
  • Nemkov Aleksej Vladimirovich
  • Shandrygolov Zakhar Nikolaevich
  • Sventskij Sergej Jur'Evich
  • Kanashov Vladimir Petrovich
  • Antonov Maksim Dmitrievich
RU2564722C1
RECOVERY METHOD OF WATER-PRODUCING OIL-AND-GAS WELL IN CONDITIONS OF ABNORMALLY LOW FORMATION PRESSURES 2009
  • Kustyshev Denis Aleksandrovich
  • Dubrovskij Vladimir Nikolaevich
  • Singurov Aleksandr Aleksandrovich
RU2410529C1

RU 2 543 005 C1

Authors

Kustyshev Denis Aleksandrovich

Panikarovskij Evgenij Valentinovich

Kustyshev Aleksandr Vasil'Evich

Nemkov Aleksej Vladimirovich

Antonov Maksim Dmitrievich

Saranchin Maksim Vladimirovich

Dates

2015-02-27Published

2014-02-12Filed