FIELD: oil and gas industry.
SUBSTANCE: thermoshaft method of high-viscosity oil pool development includes the injection of a heat carrier to an oil reservoir through vertical injectors, extraction of a formation fluid through upward and horizontal producers drilled from the drilled pathway of the oil formation, at that in the drilled pathway wellheads of producers of the upper and lower layers are coupled in pairs by pipelines with stop valves and the production of the formation fluid is carried out in a cyclic mode, the producers of the upper layer are used in an injection mode until the wells of the lower layer are filled and in a production mode - until the minimum or complete discharge of the formation fluid is obtained.
EFFECT: improved crude oil recovery factor, even heating of the formation from up to bottom.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
THERMOSHAFT METHOD OF HIGH VISCOUS OIL PRODUCTION | 2014 |
|
RU2552569C1 |
COMBINED METHOD OF THERMAL WELL DEVELOPMENT OF HIGH-VISCOUS OIL DEPOSIT | 2010 |
|
RU2425211C1 |
THERMOSHAFT METHOD OF HIGH-VISCOSITY OIL DEVELOPMENT | 2014 |
|
RU2560457C1 |
THREE-ROW THERMAL WELL HIGH-VISCOSITY OIL DEPOSIT DEVELOPMENT METHOD | 2015 |
|
RU2580341C1 |
METHOD OF OIL FORMATION DEVELOPMENT | 2001 |
|
RU2199004C2 |
METHOD OF HOT WELL DEVELOPMENT OF HIGH-VISCOSITY OIL DEPOSIT BY SINGLE-BED SYSTEM | 2013 |
|
RU2529039C1 |
THERMOSHAFT METHOD OF DEVELOPMENT OF FRACTURED DEPOSIT OF HIGH-VISCOSITY OIL | 2013 |
|
RU2535326C2 |
THERMAL WELL METHOD OF DEVELOPING FRACTURED DEPOSIT OF EXTRA-HEAVY OIL | 2011 |
|
RU2467161C1 |
METHOD FOR DEVELOPMENT OF DEPOSITS OF HIGH-VISCOSITY OIL OR NATURAL BITUMEN | 2015 |
|
RU2608104C1 |
UNDERGROUND-SURFACE METHOD OF DEVELOPMENT OF HIGH- VISCOSITY OIL DEPOSIT | 2001 |
|
RU2199657C2 |
Authors
Dates
2015-03-10—Published
2014-01-15—Filed