FIELD: oil and gas industry.
SUBSTANCE: method includes running in of a working part with channel or channels on its surface, which is placed at outer surface of the tubing string, up and down movement of the tubing string with overflow of working fluid filling the well bore through channel or channels in the working part. Overflow of working fluid from annular space below the working part to from annular space above the working part is made through bypass channel inside the tubing string bypassing channel or channels at surface of the working part in case of downward motion. Broken combatant is removed by fluid delivered from the formation with additional of working fluid to the tubing string from the surface without its pumping from the surface through the treated zone.
EFFECT: improved treatment efficiency without limitation of simultaneously treated thickness of the perforation interval.
5 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR CLEANING OF BOTTOM HOLE FORMATION ZONE PERFORATION AND UNSEALING ZONE | 2014 |
|
RU2545232C1 |
DEVICE FOR SELECTIVE CLEANING OF PERFORATION CHANNELS AND BOTTOMHOLE FORMATION ZONE OF CONVENTIONALLY UNLIMITED THICKNESS | 2010 |
|
RU2450118C1 |
WELL KILLING METHOD | 2013 |
|
RU2545197C1 |
METHOD FOR REMOVING LIQUID FROM WELLS AND BHZ BY HYDROPNEUMATIC SWABBING | 2021 |
|
RU2753721C1 |
DEVICE FOR WELL CLEANING | 2009 |
|
RU2408777C1 |
METHOD AND FACILITY FOR SIMULTANEOUS SELECTIVE TREATMENT OF PERFORATION CHANNELS AND TREATMENT OF BOTTOMHOLE OF CONDITIONALLY ENDLESS THICKNESS LAYER | 2007 |
|
RU2359114C2 |
PROCEDURE FOR WELL KILLING | 2010 |
|
RU2431736C1 |
DEVICE FOR INSTALLATION OF DEVICES ON EXTERNAL SURFACE OF TUBING | 2015 |
|
RU2577050C1 |
METHOD OF DIRECTIONAL GENERATION OF STEADY STRUCTURED FINE GAS AND LIQUID MIX IN CONDITIONS OF PORTION SUPPLY OF LIQUID AND GAS | 2014 |
|
RU2553105C1 |
FLOWMETER | 2017 |
|
RU2643688C1 |
Authors
Dates
2015-03-20—Published
2014-03-04—Filed