FIELD: metallurgy.
SUBSTANCE: shaping of a band in rolls with open passes is performed till a bending angle of 180°, moulding of a tube workpiece in a drawing die - by folding the band edges into a tube workpiece till the scheduled angle; moulding is performed in the rolls with cold passes with a split washer; final moulding in the rolls with closed passes without any split washer with the same diameter for its calibration into the tube prior to welding. The mill includes a frame, a housing with vertical rolls, lower and upper moulding drive rolls with open passes and closed passes with a split washer, edger rolls alternating with them, the drawing die, a drive and a welding device. The drawing die is fixed with hold-down planks in the housing mounted on the frame after the last rolls with open passes and made in the form of a sleeve with a pass with a conical surface, which is located inside it, with a diameter reducing from the inlet side to the outlet side. The pass is located so that a cross section in the form of an ellipse is formed in a plane perpendicular to the frame axis. After the rolls with closed passes with the split washer there installed are rolls for calibration of the tube workpiece into a tube before the welding device.
EFFECT: excluding twisting of workpiece edges.
2 cl, 8 dwg
Title | Year | Author | Number |
---|---|---|---|
LONGITUDINAL WELDED TUBE PRODUCTION MILL | 2012 |
|
RU2504449C1 |
MILL FOR MANUFACTURING OF WELDED STRAIGHT-SEAM TUBES | 0 |
|
SU599883A1 |
STAND FOR MANUFACTURING WELDED STRAIGHT-SEAM TUBES | 0 |
|
SU703176A1 |
ELECTRICALLY WELDED STRAIGHT-SEAM TUBE PRODUCTION METHOD | 2005 |
|
RU2296638C1 |
METHOD OF PRODUCING LONGITUDINAL WELDED TUBES AND TUBE-WELDING MILL FOR EFFECTING SAME | 0 |
|
SU1523210A1 |
METHOD OF PRODUCTION WELDED LONGITUDINAL PIPES WITH DIAMETER OF FROM 10 TO 530 mm ON CONTINUOUS ELECTRIC PIPE WELDERS | 2018 |
|
RU2677558C1 |
METHOD OF PIPE BLANK MANUFACTURE IN PIPE ELECTRIC WELDING LINE | 2006 |
|
RU2339475C2 |
METHOD OF MAKING STRAIGHT-SEAM ELECTRICALLY WELDED TUBES | 1994 |
|
RU2056961C1 |
METHOD OF MANUFACTURING ELECTRICALLY WELDED STRAIGHT-SEAM TUBES | 0 |
|
SU893281A1 |
METHOD FOR CONTROLLING PREPARATION OF PRODUCTION PROCESS OF STRAIGHT-SEAM ELECTRICALLY WELDED TUBES IN LINE OF HEAT POWER STATION | 2006 |
|
RU2312723C1 |
Authors
Dates
2015-04-10—Published
2013-07-05—Filed