FIELD: process engineering.
SUBSTANCE: invention relates to production of composite article whereat multiple elements are glued together under pressure. Said glue comprises one first component and at least one second component. Additionally, method comprises adjustment of ratio between first and second glue components. Time of compaction makes a restricting factor for the plant output and impedes the production planning. Compaction time is influenced by temperature of elements and ratio between glue components. Note here that said time can be notably decreased by increasing the amount of hardener as compared with that of used resin.
EFFECT: control over gluing to ensure efficient production planning.
9 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MAKING COMPOSITE CONSTRUCTION ARTICLE | 2011 |
|
RU2558216C2 |
WATER-DISPERSION ADHESIVE SYSTEM | 2020 |
|
RU2764438C1 |
METHOD AND DEVICE TO APPLY GLUE AND CURATIVE COMPONENTS | 2003 |
|
RU2331511C2 |
PRODUCTION OF THE GLUED WOODWORK BY THE SHORT-CLOCK METHOD | 2003 |
|
RU2309174C2 |
METHOD FOR LEAD GLUEING | 0 |
|
SU1646865A1 |
ADHESIVE SYSTEM WITH LOW FORMALDEHYDE RELEASE | 2009 |
|
RU2520443C2 |
METHOD OF PRODUCING WOOD LAMINAR MATERIALS IN USING FAST-CURING GLUES AT AMBIENT TEMPERATURE | 2006 |
|
RU2413614C2 |
ADHESIVE SYSTEM | 2012 |
|
RU2605134C2 |
HEAT-ACTIVATED ADHESIVE LINING MATERIAL, INTEGRATED HEAT-ACTIVATED ADHESIVE DRAPERY MATERIAL, AND METHOD OF PREPARING SUCH MATERIAL | 1993 |
|
RU2104158C1 |
MECHANICAL SPLICED PLATE OF WOOD MATERIAL | 2001 |
|
RU2286248C2 |
Authors
Dates
2015-10-27—Published
2011-05-09—Filed