FIELD: machine building.
SUBSTANCE: invention relates to lifting cranes. Crane has at least one horizontal lattice span beam having plurality of cross braces in form of plates, which connect upper horizontal belt with lower horizontal belt. Span beam bears load trolley with hoisting facilities to move said trolley along mentioned span beam. Upper and lower belts of span beam are interconnected by multiple struts and posts, made in form of plates with main surface arranged across length of span beam. On upper and lower ends of each brace strut is at least one groove on main surface, through which span beam lower belt or upper belt pass with abutment to edges of main surface, to which said struts and posts are welded.
EFFECT: simplified span beam manufacture with simultaneous increase of its strength at longitudinal bend.
70 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
LIFTING CRANE, BRIDGE OR GANTRY, WITH, AT LEAST, TWO GIRDER BEAMS | 2013 |
|
RU2637715C2 |
HOISTING BRIDGE OR GANTRY CRANE WITH NOT LESS THAN ONE SPAN BEAM | 2016 |
|
RU2669471C1 |
HOISTING CRANE PARTICULARLY, BRIDGE CRANE OR GANTRY WITH CRANE JIB | 2013 |
|
RU2574299C1 |
GIRDER BEAM FOR THE OVERHEAD OR GANTRY CRANE AND A LIFTING CRANE CONTAINING SUCH GIRDER BEAM | 2015 |
|
RU2654840C1 |
HOISTING CRANE, IN PARTICULAR, OVERHEAD OR GANTRY CRANE CONTAINING CRANE BEAM, AND METHOD OF CRANE BEAM INSTALLATION ON HOISTING CRANE | 2013 |
|
RU2596204C2 |
CRANE TRUCK | 2015 |
|
RU2672309C1 |
CRANE SPAN | 0 |
|
SU1505880A1 |
CURB SYSTEM | 2005 |
|
RU2370607C2 |
SPAN STRUCTURE | 2016 |
|
RU2650980C2 |
MODULAR DEVICE FOR MAKING CABINETS HAVING PLASTIC STRUCTURE | 2012 |
|
RU2589438C2 |
Authors
Dates
2016-07-20—Published
2013-10-04—Filed