FIELD: oil industry.
SUBSTANCE: invention relates to oil and gas industry and, in particular, to production of gas during operation of sea and offshore deposits, including Arctic zone. Method comprises drilling a main shaft on shore to level of sea bed. In lower part of main shaft an inclined section is formed with deviation from vertical of up to 80°. Further, a horizontal section is drilled, which is laid under sea bottom with length providing drilling of productive formation in required design point of productive formation. Horizontal section is made with an end which is arranged perpendicular to horizontal section, parallel to roof of productive formation and higher than gas-water contact. Before said end in main shaft an offshoot is made, which is directed in diametrically opposite direction from said end of horizontal section of main shaft in same productive formation and is located parallel to roof of productive formation and higher than gas-water contact.
EFFECT: technical result is increase of gas production due to expansion of productive formation drainage zone, reduced costs for maintenance of well due to reduced period of production of gas reserves from deposit.
1 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
DESIGN OF COASTAL MULTI-HOLE INTELLIGENT GAS WELL FOR DEVELOPMENT OF OFFSHORE DEPOSIT | 2015 |
|
RU2580862C1 |
MARINE MULTIHOLE GAS WELL FOR OPERATION OF OFFSHORE DEPOSITS ARCTIC ZONE WITH SURFACE ARRANGEMENT OF WELLHEAD EQUIPMENT | 2014 |
|
RU2584706C1 |
METHOD OF RECOVERY OF FLOODED GAS WELL WITH COLLAPSED PRODUCTION TUBING IN PRODUCTIVE INTERVAL | 2011 |
|
RU2465434C1 |
METHOD OF OPERATION OF HYDROCARBONS RESERVOIR | 2014 |
|
RU2564722C1 |
METHOD OF DRILLING-IN | 2008 |
|
RU2382166C1 |
METHOD OF EXPLORING OIL-GAS DEPOSITS | 1997 |
|
RU2177545C2 |
RECOVERY OF SELF-SQUEEZING GAS WELL WITH ABNORMALLY LOW SEAM PRESSURE | 2013 |
|
RU2539060C1 |
METHOD FOR THERMAL GASEOUS HYDRATE FIELD DEVELOPMENT | 2005 |
|
RU2306410C1 |
CONSTRUCTION METHOD OF MULTIBRANCH WELL | 2011 |
|
RU2456426C1 |
METHOD TO OPERATE HYDROCARBON ACCUMULATION | 2010 |
|
RU2451789C2 |
Authors
Dates
2016-11-10—Published
2015-01-12—Filed