METHOD OF WELL DRILLING Russian patent published in 2017 - IPC E21B21/00 E21B7/00 

Abstract RU 2606742 C1

FIELD: construction; mining.

SUBSTANCE: invention relates to construction of wells and can be used during well drilling through flushing fluid loss zone. To implement the method a pipe string with a packer is lowered, the packer is placed above the lower interval of the loss zone. When the pipe string with the packer is lowered in case of slacking-off up to 3 ton the lowering is stopped, the well is washed with no reciprocation of the pipe string with the flow rate of up to 15 l/sec during 1.5 cycle, the lowering is continued. Before each injection via the pipe string to the loss zone before each packer setting the well is washed for 1.0–1.5 cycle with a natural water suspension. Setting of the packer is performed in the natural water suspension, after the setting the well is examined by pumping with process water on at least two modes, increased is the injection pressure at each subsequent mode, kept constant is the injection pressure, registered is the injection pressure and the volume for each mode, the well injection capacity coefficient is calculated as a quotient of division of the difference of volumes of the pumped liquid on the next and on the previous modes to the pressure difference of pumping the liquid on the next and the previous modes. When the intake capacity coefficient is up to 0.4 insulation works are not performed. When the intake capacity coefficient is from 0.4 to 1.0 the drilling fluid is pumped with sawdust or rubber crumb, when the intake capacity coefficient is from 1.0 to 1.5 the drilling fluid is pumped with sawdust and/or cord fibre, when the intake capacity coefficient is from 1.5 to 2.0 the drilling fluid is pumped with cord fibre and motes, when the intake capacity coefficient is from 2.0 to 2.5 the drilling fluid is pumped with motes with further pumping of the drilling fluid with cord fibre, the pumping is performed to the loss termination pressure, and prior to lowering the drilling assembly and the well drilling-in the well is filled with the drilling fluid with the density of 1.35 g/cm3, the relative viscosity of 25–60 c, the filtration of 1–2 cm3/30 min, pH=8–9, containing oil up to 10 %, washing during 1.5 cycle and lifting the drilling tool with the well make-up every 250–300 m of the lifting.

EFFECT: expanded range of the loss isolation in the well.

1 cl

Similar patents RU2606742C1

Title Year Author Number
WELL CONSTRUCTION METHOD 2018
  • Osipov Roman Mikhajlovich
  • Abakumov Anton Vladimirovich
  • Malkovskij Maksim Aleksandrovich
RU2723814C2
METHOD FOR ISOLATION OF THIEF ZONE DURING WELL DRILLING 2015
  • Ibragimov Nail Gabdulbarievich
  • Aslyamov Ajrat Ingelevich
  • Garaev Rafael Rasimovich
  • Mubarakshin Marsel Magsumovich
  • Absalyamov Ruslan Shamilevich
RU2588074C1
METHOD FOR WELL DRILLING 2012
  • Ibragimov Nail' Gabdulbarievich
  • Taziev Mirgazijan Zakievich
  • Rakhmanov Ajrat Rafkatovich
  • Asljamov Ajrat Ingelevich
  • Garaev Rafaehl' Rasimovich
  • Osipov Roman Mikhajlovich
  • Khamidullin Fanil' Ravisovich
RU2478769C1
METHOD FOR ISOLATION OF LOST CIRCULATION ZONE OF DRILLING MUD DURING OIL AND GAS WELLS 2023
  • Fajzullin Damir Mugambarovich
  • Khakov Rasim Raemovich
  • Timkin Nafis Yagfarovich
  • Cheremshantsev Maksim Valerevich
RU2825228C1
METHOD FOR OPENING FORMATION CHARACTERIZED BY DISASTROUS LOST CIRCULATION BY DRILLING THEREOF 2004
  • Bikchurin T.N.
  • Studenskij M.N.
  • Vakula A.Ja.
  • Bikbulatov R.R.
  • Shajakhmetov A.Sh.
  • Gimazov Eh.N.
  • Zamaliev T.Kh.
  • Kashapov S.A.
RU2259460C1
METHOD OF ISOLATION OF ABSORPTION ZONES DURING WELL DRILLING 2020
  • Sagatov Ramis Fanisovich
  • Osipov Roman Mikhailovich
  • Abakumov Anton Vladimirovich
RU2743123C1
METHOD FOR DISASTROUS DRILLING MUD LOSS ZONES ISOLATION DURING OIL AND GAS HOLE DRILLING 2004
  • Bikchurin Talgat Nazmetdinovich
  • Studenskij Mikhail Nikolaevich
  • Vakula Andrej Jaroslavovich
  • Zamaliev Tagir Khalafovich
  • Shajakhmetov Azat Shamilevich
  • Bikbulatov Rashit Rafaehlovich
  • Maksimov Vladimir Nikolaevich
  • Kashapov Sajfutdin Avzalovich
RU2270327C1
METHOD OF ISOLATION OF THIEF ZONE DURING WELL DRILLING 2014
  • Ibragimov Nail' Gabdulbarievich
  • Rakhmanov Ajrat Rafkatovich
  • Asljamov Ajrat Ingelevich
  • Garaev Rafaehl' Rasimovich
  • Osipov Roman Mikhajlovich
  • Sinchugov Nikolaj Sergeevich
RU2562306C1
WELL DRILLING METHOD 2014
  • Ibragimov Nail' Gadbulbarievich
  • Asljamov Ajrat Ingelevich
  • Garaev Rafaehl' Rasimovich
  • Sinchugov Nikolaj Sergeevich
  • Osipov Roman Mikhajlovich
RU2547862C1
METHOD FOR WELL CONSTRUCTION 2012
  • Khisamov Rais Salikhovich
  • Vakula Andrej Jaroslavovich
  • Starov Oleg Evgen'Evich
  • Galimov Razif Khirazetdinovich
  • Taipova Venera Asgatovna
  • Bachkov Al'Bert Petrovich
RU2494214C1

RU 2 606 742 C1

Authors

Khisamov Rais Salikhovich

Salikhov Mirsaev Mirgazyamovich

Mukhliev Ilnur Rashitovich

Sagidullin Lenar Rafisovich

Shayakhmetova Guzel Zinnurovna

Dates

2017-01-10Published

2016-03-14Filed